Toronto address · Ward 13, Toronto Centre
177 Front St E
The City of Toronto has 19 building permits since 2017 (5 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Proposal for indoor gym
Applied Apr 1, 2026 · issued Jun 25, 2026 · Permit 26 137960 HVA
- Inspections under way
Plumbing
Plumbing - Proposal for indoor gym
Applied Apr 1, 2026 · issued Jun 25, 2026 · Permit 26 137960 PLB
- Inspections under way
Addition or alteration · Interior alterations
Proposal for indoor gym
Applied Apr 1, 2026 · issued Jun 23, 2026 · Permit 26 137960 BLD
- Closed
Designated structure · Sign building permit related
A proposal to erect and display one illuminated projecting sign displaying static copy.***P***
Applied Aug 16, 2024 · issued Aug 22, 2024 · completed Dec 17, 2024 · Permit 24 199350 DST
- Approved
Alternative solution
This alternative solution proposes the omission of sprinkler system protection underneath the exterior portion of the fifth floor slab which forms the cover of the breezeway
Applied Jul 7, 2024 · completed Nov 25, 2024 · Permit 24 176039 ALT
- Approved
Alternative solution
Alternative solution proposal details the intended compensating measures to be applied due to the reduced pool deck width at the south side of the outdoor amenity pool located on level 11 of the 177 front street building.
Applied May 8, 2024 · completed Jun 5, 2024 · Permit 24 145695 ALT
- Closed
Fire and security upgrade · Electromagnetic locks
Maglocks <<>>
Applied Mar 1, 2024 · issued May 7, 2024 · completed Sep 18, 2024 · Permit 24 121097 FSU
- Closed
New building
Rev 02 - Re-issued Drawing SP-15:Sprinkler protection is required due to the occupancy above" as referenced in NFPA 13 2013 edition (highlighted in yellow on attached drawing) and was used when we designed this project for the permit. It has since been removed in the 2019 edition. (SeeA.9.2.3.2 2019 edition). Also, 55' ceiling height above floor, sprinklers would not work efficiently.Revision 01 - structural revision to remove expansion joints.
Applied Dec 12, 2023 · issued Dec 9, 2024 · completed May 2, 2025 · Permit 17 269706 BLD (revision 02)
- Closed
Plumbing
Revision 01 - after discussion with United Engineers propose to relocate both metres to the west side of the intake shaft, using 1-1/2 parking spaces, and building a shaft/enclosure around the incoming domestic water mains from the entry point to the new proposed water metre room. Plumbing - Proposal for new 29 storey condo with commercial at grade, 1531 resisential units, and 1 level of below grade parking.
Applied Mar 30, 2022 · issued Apr 4, 2022 · completed Feb 2, 2025 · Permit 17 269706 PLB (revision 01)
- Closed
New building
Revision 01 - structural revision to remove expansion joints.
Applied Apr 8, 2021 · issued Sep 8, 2021 · completed May 2, 2025 · Permit 17 269706 BLD (revision 01)
- Cancelled
Alternative solution
Alternative Solution Application to use Type304/304L, Schedule 40 stainless steel piping (as per Division-C; Section 2.1 of the OBC).
Applied Feb 3, 2020 · completed May 29, 2020 · Permit 20 111394 ALT
- Closed
Partial permit · Partial permit - structural framing
Part Permit - Proposal for new 29 storey condo with commercial at grade, 1531 resisential units, and 1 level of below grade parking.
Applied Sep 24, 2018 · issued Jan 9, 2020 · completed Aug 10, 2020 · Permit 17 269706 STR
Show 7 more permits
- Closed
Addition or alteration · Shoring
Stand alone Excavation and Shoring work for soil investigation and remediation.
Applied May 28, 2018 · issued Jun 28, 2018 · completed Nov 14, 2023 · Permit 18 166805 BLD
- Closed
New building
Proposal for new 29 storey condo with commercial at grade, 1531 residential units, and 1 level of below grade parking.
Applied Nov 30, 2017 · issued Aug 10, 2020 · completed May 2, 2025 · 1,531 homes added · Permit 17 269706 BLD
- Closed
Drains and site services
Drain - Proposal for new 29 storey condo with commercial at grade, 1531 resisential units, and 1 level of below grade parking.
Applied Nov 30, 2017 · issued Oct 16, 2018 · completed Feb 6, 2025 · Permit 17 269706 DRN
- Closed
Drains and site services · Inside and outside drains
Drain - Proposal for new 29 storey condo with commercial at grade, 1531 resisential units, and 1 level of below grade parking.
Applied Nov 30, 2017 · issued Oct 16, 2018 · completed Feb 2, 2025 · Permit 17 269706 STS
- Closed
Plumbing
Plumbing - Proposal for new 29 storey condo with commercial at grade, 1531 resisential units, and 1 level of below grade parking.
Applied Nov 30, 2017 · issued Jan 24, 2020 · completed Feb 2, 2025 · Permit 17 269706 PLB
- Closed
Heating and ventilation
HVAC - Proposal for new 29 storey condo with commercial at grade, 1531 resisential units, and 1 level of below grade parking.
Applied Nov 30, 2017 · issued Oct 7, 2019 · completed May 2, 2025 · Permit 17 269706 HVA
- Cancelled
Partial permit · Partial permit - shoring
Part Permit - Proposal for new 29 storey condo with commercial at grade, 1531 resisential units, and 1 level of below grade parking.
Applied Nov 30, 2017 · completed Oct 11, 2018 · Permit 17 269706 SHO
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
234-250 King Street East and 162 Princess Street
40 storeys · 514 homes · Mixed use
150 m away · Condominium · Approved · filed Oct 21, 2021
- Under review
254-266 King Street East, 427-435 Adelaide Street East and 157 Princess Street
40 storeys · 819 homes · Mixed use
170 m away · Site plan · Under review · filed Oct 15, 2021
- Under review
65 George Street and 187 King Street East
17 storeys · Non-residential
230 m away · Site plan · Under review · filed Apr 25, 2022
- Approved
46 storeys · 437 homes · Mixed use
290 m away · Site plan · Approved · filed Aug 11, 2022
- Under appeal
56-60 Berkeley Street and 296-300 King Street East
42 storeys · 449 homes · Mixed use
310 m away · Site plan · Under appeal · filed Aug 14, 2023
- Under review
69-75 Ontario Street and 429-455 Richmond Street East
43 storeys · 380 homes · Mixed use
400 m away · Condominium · Under review · filed Nov 8, 2021
Neighbours’ Committee of Adjustment files within 250 m
120 Front St E · Minor variance
To alter the existing mixed-use building by designating 37 of the 43 non-residential parking spaces (located on the B-1 level) as a "Public Parking" use with the intent of permitting 20 of the 37 parking spaces to be leased as valet parking to a proposed hotel (municipally known as 197 King Street East) and the remaining 17 parking spaces to be rented to members of the public on a monthly basis.
190 m away · filed Sep 15, 2022 · Approved
280 King St E · Minor variance
To permit laboratory and office uses within this existing building.
240 m away · filed Jun 14, 2022 · Approved
164 Princess St · Minor variance
To alter the existing four-storey detached office building by constructing a partial fifth floor sunroom addition.
180 m away · filed Apr 29, 2022 · Approved
197 King St E · Minor variance
To alter the existing 4-storey mixed-use building by constructing additions above and to the rear resulting in an 8-storey mixed use building containing a commercial restaurant use at the ground floor and basement with hotel suites above.
190 m away · filed Oct 30, 2019 · Approved
159 Frederick St · Minor variance
To alter the 11-storey mixed-use building by converting a portion of the basement into office space.
120 m away · filed Jun 12, 2019 · Approved
280 King St E · Consent
To obtain consent to sever for the purpose of a lot addition.
240 m away · filed Aug 20, 2018 · Approved
280 King St E · Minor variance
To maintain the existing eight-storey office building on a reduced lot that was created by Consent Application B0082/18TEY, which altered the northeast rear lot line.
240 m away · filed Aug 20, 2018 · Approved
120 Front St E · Minor variance
To convert 41 existing underground parking spaces (currently designated for office use) to a commercial parking garage. There will be 90 parking spaces in total: 45 residential, 4 office, and 41 in the new commercial parking garage. No change to the built form is proposed.
190 m away · filed Sep 15, 2017 · Withdrawn
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.