Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

179 Booth Ave

The City of Toronto has 8 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Revision 01: revise plans to remove basment bedroom including egress winow and covert to a rec. roomProposed underpin and finish basement with bedroom, bathroom and laundry.

    Applied Feb 23, 2023 · issued Mar 1, 2023 · Permit 21 213060 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - Proposal to construct a 3rd floor addition and 3rd floor rear deck to an existing 2 storey SFD-semi dwelling.

    Applied Nov 26, 2021 · issued Dec 13, 2021 · completed Jan 18, 2023 · Permit 21 214092 HVA

    Closed
  • Small residential project · Multiple projects

    Proposal to construct a 3rd floor addition and 3rd floor rear deck to an existing 2 storey SFD-semi dwelling.

    Applied Sep 17, 2021 · issued Dec 2, 2021 · completed Jan 18, 2023 · Permit 21 214092 BLD

    Closed
  • Plumbing

    Plumbing - Proposal to construct a 3rd floor addition and 3rd floor rear deck to an existing 2 storey SFD-semi dwelling.

    Applied Sep 17, 2021 · issued Dec 2, 2021 · completed Jan 18, 2023 · Permit 21 214092 PLB

    Closed
  • Small residential project · Multiple projects

    Proposed underpin and finish basement with bedroom, bathroom and laundry.

    Applied Sep 15, 2021 · issued Oct 20, 2021 · Permit 21 213060 BLD

    Inspections under way
  • Drains and site services

    Drain - Proposal for interior alterations for existing sfd-semi

    Applied Jun 9, 2020 · issued Jul 10, 2020 · completed Mar 3, 2021 · Permit 20 154244 DRN

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations for existing sfd-semi

    Applied Jun 9, 2020 · issued Jul 10, 2020 · completed Mar 3, 2021 · Permit 20 154244 PLB

    Closed
  • Small residential project · Interior alterations

    Proposal for interior alterations for existing sfd-semi

    Applied Jun 9, 2020 · issued Jul 10, 2020 · completed Mar 3, 2021 · Permit 20 154244 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 929 Queen St E · Minor variance

    To alter the development standards for the 9-storey mixed-use building (35 m in height to the top of the mechanical penthouse) containing commercial uses on the ground and mezzanine floors with side (west) second-floor terraces and a side (east) rooftop amenity terrace (approved under Site Specific Zoning By-Law 291-2024), by increasing the metric height of the first, second, sixth, and eighth storeys (by 0.7 m, 2.45 m, 0.5 m, and 0.4 m respectively), with a maximum building height of 35 m to the top of the ninth storey (excluding the mechanical penthouse). Also, to increase the total gross f…

    240 m away · filed Apr 15, 2026 · Approved

  • 132 Morse St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with a rooftop deck above.

    200 m away · filed Oct 3, 2024 · Approved

  • 173 Logan Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addittion with a front third storey shed dormer and rear third storey balcony.

    170 m away · filed Jun 6, 2023 · Approved

  • 118 Booth Ave · Minor variance

    To convert the existing two-storey semi-detached dwelling from three-units into two-units by constructing a rear second storey addition, front ground floor stairs and to enclose the front porch.

    170 m away · filed Dec 21, 2022 · Approved

  • 163 Booth Ave · Minor variance

    To construct a new three-storey detached dwelling with a sunken front walkout, a rear lower courtyard, and a second storey rear deck. Also, to permit the construction of a two-storey ancillary building (laneway suite), currently under a separate building permit, in the rear yard, abutting the laneway.

    40 m away · filed Jul 8, 2022 · Approved

  • 43 Mc Gee St · Minor variance

    To alter the existing one-storey townhouse by constructing a rear one-storey addition, a complete second storey addition, and a third storey addition with a rooftop deck. Also, to reconstruct the front porch.

    170 m away · filed Jun 9, 2022 · Approved

  • 290 Logan Ave · Minor variance

    To alter the existing two-storey rowhouse end unit by constructing a third-storey addition with a front third-floor deck.

    250 m away · filed Apr 13, 2022 · Approved

  • 50 Mc Gee St · Minor variance

    To convert the existing one-storey two-unit detached dwelling to a four-and-one-half-storey eight-unit apartment building by constructing second, third and fourth storey additions with rear and front ground floor decks, rear and front third storey balconies, and rear and front fourth storey balconies. Also, to construct a mechanical penthouse with accessible rooftop terraces. In addition, to alter the existing rear one-storey ancillary building (detached garage) by constructing a complete second storey addition in order to convert this building into a garden suite.

    200 m away · filed Mar 25, 2022 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.