Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 20, Scarborough Southwest

179 Harewood Ave

The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Addition(s)

    REV. #1- Revision to front porch - columns to be removedconstruct 2nd floor addition to 1.5 storey single family dwelling

    Applied Sep 29, 2016 · issued Jun 6, 2017 · completed Oct 30, 2020 · Permit 16 148784 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - construct 2nd floor addition to 1.5 storey single family dwelling

    Applied May 30, 2016 · issued Jul 5, 2016 · completed May 2, 2025 · Permit 16 148784 HVA

    Closed
  • Plumbing

    Plumbing - construct 2nd floor addition to 1.5 storey single family dwelling

    Applied May 2, 2016 · issued Jul 5, 2016 · completed May 2, 2025 · Permit 16 148784 PLB

    Closed
  • Small residential project · Addition(s)

    construct 2nd floor addition to 1.5 storey single family dwelling

    Applied May 2, 2016 · issued Jul 5, 2016 · completed Oct 30, 2020 · Permit 16 148784 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To construct a wood canopy over the existing front entry.

    Decision: Approved (hearing Mar 16, 2017)

    Filed Jan 31, 2017 · File A0031/17SC

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 16 Horfield Ave · Minor variance

    70 m away · filed Apr 22, 2024 · Deferred

  • 161 Dorset Rd · Minor variance

    To remove garage door and to convert side garage into side yard storage.

    220 m away · filed Sep 27, 2023 · Approved

  • 162 Harewood Ave · Minor variance

    To construct a new two-storey two unit detached dwelling. A previous committee of adjustment application (A0023/21SC) refused a variance for floor area.

    70 m away · filed Jan 3, 2022 · Approved

  • 37 Allister Ave · Minor variance

    To permit the construction of a new 2-storey detached dwelling. This proposed development requires variances to the Zoning By-law. NOTE: 37 Allister Avenue is comprised of two whole lots (Lots 159 and 160) on Registered Plan 2541. The proposed/existing lot frontages and proposed/existing lot areas for both Lots 159 and 160 were established through the registration of the plan of subdivision.

    110 m away · filed Mar 2, 2021 · Refused

  • 37 Allister Ave · Minor variance

    To permit the construction of a new 2-storey detached dwelling. This proposed development requires variances to the Zoning By-law. NOTE: 37 Allister Avenue is comprised of two whole lots (Lots 159 and 160) on Registered Plan 2541. The proposed/existing lot frontages and proposed/existing lot areas for both Lots 159 and 160 were established through the registration of the plan of subdivision.

    110 m away · filed Mar 2, 2021 · Refused

  • 62 Allister Ave · Minor variance

    To construct a new two-storey detached dwelling.

    190 m away · filed Feb 8, 2021 · Approved

  • 162 Harewood Ave · Minor variance

    To construct a new two-storey two unit detached dwelling.

    70 m away · filed Jan 12, 2021 · Refused

  • 142 Harewood Ave · Minor variance

    To construct a new two-storey detached dwelling. This application was deferred at the March 11, 2021 hearing so the applicant could revise the proposal.

    220 m away · filed Dec 22, 2020 · Approved

Everything planned in Scarborough Southwest

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.