Toronto address · Ward 5, York South-Weston
18 Burr Ave
The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposed enlargement of front porch, 1-storey side yard addition to increase size of integral garage and 1-storey addition in the rear yard of an existing.
Applied Jan 7, 2020 · issued Jan 14, 2020 · completed Feb 5, 2021 · Permit 19 212380 HVA
- Closed
Plumbing
Plumbing - Proposed enlargement of front porch, 1-storey side yard addition to increase size of integral garage and 1-storey addition in the rear yard of an existing.
Applied Aug 27, 2019 · issued Sep 5, 2019 · completed Feb 5, 2021 · Permit 19 212380 PLB
- Closed
Small residential project · Multiple projects
Proposed enlargement of front porch, 1-storey side yard addition to increase size of integral garage and 1-storey addition in the rear yard of an existing.
Applied Aug 27, 2019 · issued Sep 5, 2019 · completed Jun 26, 2025 · Permit 19 212380 BLD
- Closed
Drains and site services
Drain - Proposed enlargement of front porch, 1-storey side yard addition to increase size of integral garage and 1-storey addition in the rear yard of an existing.
Applied Aug 27, 2019 · issued Sep 5, 2019 · completed Feb 5, 2021 · Permit 19 212380 DRN
- Closed
Drains and site services · Back water valve (Sewer only)
Proposed installation of a new back water valve in an existing single family detached dwelling.
Applied Aug 27, 2019 · issued Aug 29, 2019 · completed Jun 30, 2025 · Permit 19 212389 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a one-storey rear addition, a new covered front porch and to extend the existing garage to the rear.
Decision: Approved (hearing Jul 18, 2019)
Filed Mar 19, 2019 · File A0156/19EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
219 Rustic Rd · Minor variance
To construct two-storey front and rear additions,a second storey addition above the existing dwelling, a carport along the east side of the dwelling, a covered front porch and a detached garage in the rear yard.
220 m away · filed Apr 22, 2024 · Approved
219 Rustic Rd · Minor variance
To construct two-storey front and rear additions,a second storey addition above the existing dwelling, a carport along the east side of the dwelling, a covered front porch and a detached garage in the rear yard.
220 m away · filed Dec 17, 2023 · Approved
1 Berryton Ave · Minor variance
To construct a one-storey north side addition and a new front porch.
200 m away · filed Apr 12, 2023 · Approved
5 Burr Ave · Minor variance
To construct a one-storey side and front addition and to construct a second storey addition above the existing dwelling.
110 m away · filed Aug 15, 2022 · Approved
117 Lawnside Dr · Minor variance
To construct a detached garage in the rear yard.
230 m away · filed Jun 28, 2022 · Approved
49 Burr Ave · Minor variance
To construct a new dwelling.
240 m away · filed Mar 24, 2022 · Approved
210 Maple Leaf Dr · Minor variance
To construct a new detached dwelling with an attached garage.
190 m away · filed Jan 27, 2021 · Approved
210 Maple Leaf Dr · Minor variance
To construct a new detached dwelling with an attached garage.
190 m away · filed Jan 27, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.