Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

18 Foundry Ave

Davenport Village Park

The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Site service

    The supply and installation of an out door spray pad in and existing park, including supply of sanitary drainage for the pad and the supply of water to the pad. Supply of water to a bottle filling station

    Applied Sep 3, 2020 · issued Aug 13, 2021 · Permit 20 189430 STS

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 31 Powerhouse St · Minor variance

    To alter the existing three-storey mixed-use building by converting two office units into two residential dwelling units.

    70 m away · filed May 16, 2025 · Approved

  • 30 Powerhouse St · Minor variance

    To alter the redevelopment plan for a seven-storey mixed-use building (as approved under Site Specific Zoning By-law 241-2024) by permitting no indoor and outdoor residential amenity space. There will be a total of eight residential dwelling units within this building.

    60 m away · filed Jul 10, 2024 · Approved

  • 900 Lansdowne Ave · Minor variance

    To reduce the width and length of 28 parking spaces provided for small vehicles. There will be a total of 827 parking spaces provided on-site.

    230 m away · filed Jan 25, 2023 · Approved

  • 30 Powerhouse St · Minor variance

    To alter the existing mixed-use building by reconstructing the exterior staircase (fire escape) which is in disrepair.

    60 m away · filed Oct 22, 2021 · Approved

  • 31 Powerhouse St · Minor variance

    To permit a take out restaurant within a portion of the existing building.

    70 m away · filed Jun 1, 2017 · Approved

  • 31 Powerhouse St · Minor variance

    To permit a restaurant with a patio within a portion of the existing building.

    70 m away · filed May 19, 2017 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.