18 Westbourne Ave

The City of Toronto has 5 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - New SFD with garage, existing house to be demolished

    Applied Nov 21, 2014 · issued Dec 4, 2014 · completed Jun 13, 2025 · Permit 14 121926 HVA

    Closed
  • Plumbing

    Plumbing - New SFD with garage, existing house to be demolished

    Applied Feb 26, 2014 · issued Jul 25, 2014 · completed Jun 13, 2025 · Permit 14 121926 PLB

    Closed
  • New house · New building

    New SFD with garage, existing house to be demolished

    Applied Feb 26, 2014 · issued Jul 25, 2014 · completed Jun 13, 2025 · 1 home added · Permit 14 121926 BLD

    Closed
  • Demolition

    demolish existing 1 storey dwelling

    Applied Feb 26, 2014 · issued Jul 25, 2014 · completed Jul 30, 2018 · Permit 14 121931 DEM

    Closed
  • Drains and site services

    Drain - New SFD with garage, existing house to be demolished

    Applied Feb 26, 2014 · issued Jul 25, 2014 · completed Mar 12, 2020 · Permit 14 121926 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 1 Donside Dr · Minor variance

    To alter the existing one-storey detached dwelling by constructing a two-storey addition atop the existing dwelling which includes a mezzanine and a third storey access to the rooftop green roof as well as two balconies located on the west and east sides of the dwellingon the scond floor.

    210 m away · filed Feb 17, 2026 · Approved

  • 33 Bexhill Ave · Minor variance

    To construct a new two-storey detached dwelling (duplex) with a covered front porch, a front balcony on the second floor and a rear deck. Cross-reference Consent and Minor Variance Applications B0039/25SC, and A0255/25SC.

    180 m away · filed Nov 27, 2025 · Approved

  • 33 Bexhill Ave · Consent

    To obtain consent to sever the property into two residential lots. The existing one-storey detached dwelling would be demolished.

    180 m away · filed Nov 27, 2025 · Approved

  • 33 Bexhill Ave · Minor variance

    To construct a new two-storey detached dwelling (duplex) with a covered front porch, a front balcony on the second floor and a rear deck. Cross-reference Consent and Minor Variance Applications B0039/25SC, and A0256/25SC.

    180 m away · filed Nov 27, 2025 · Approved

  • 50 Westbourne Ave · Minor variance

    To construct a new three storey detached fourplex. The existing detached dwelling will be demolished. Cross reference Consent and Minor Variance applications B0038/25SC & A0253/25SC.

    240 m away · filed Nov 25, 2025 · Deferred

  • 50 Westbourne Ave · Consent

    To obtain consent to sever the existing lot into two new residential lots. Cross reference Minor Variance applications A0253/25SC & A0254/25SC being considered together.

    240 m away · filed Nov 25, 2025 · Deferred

  • 50 Westbourne Ave · Minor variance

    To construct a new three storey detached fourplex. The existing detached dwelling will be demolished. Cross reference Consent and Minor Variance applications B0038/25SC & A0254/25SC.

    240 m away · filed Nov 25, 2025 · Deferred

  • 21 Bexhill Ave · Minor variance

    To construct a new two storey fourplex. The existing one storey dwelling will be demolished. NOTE: This application was previously deferred at the Committee of Adjustment Hearing on December 3, 2025.

    130 m away · filed Oct 14, 2025 · Approved

Everything planned in Scarborough Southwest

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.