Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

1800 Yonge St

The City of Toronto has 21 building permits since 2017 (7 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Installation of new bulk soap and mirachem distribution system for washing the trains¿ interiors in TTC Davisville Carhouse. This includes installation of tanks, pumps and hosedown stations in the Carhouse

    Applied Jan 26, 2024 · issued Jun 21, 2024 · completed Feb 6, 2026 · Permit 24 108587 HVA

    Closed
  • Plumbing

    Plumbing - Installation of new bulk soap and mirachem distribution system for washing the trains¿ interiors in TTC Davisville Carhouse. This includes installation of tanks, pumps and hosedown stations in the Carhouse

    Applied Jan 26, 2024 · issued Jun 21, 2024 · completed Feb 6, 2026 · Permit 24 108587 PLB

    Closed
  • Addition or alteration · Other

    Installation of new bulk soap and mirachem distribution system for washing the trains interiors in TTC Davisville Carhouse. This includes installation of tanks, pumps and hosedown stations in the Carhouse

    Applied Jan 26, 2024 · issued Jun 21, 2024 · completed Feb 19, 2026 · Permit 24 108587 BLD

    Closed
  • Addition or alteration · Interior alterations

    Construct new access ramps from ground level to interediate pit level

    Applied Nov 13, 2023 · Permit 23 225212 BLD

    Under review
  • Addition or alteration · Other

    Revision #1 - to reflect deletion of canopy railing and associated roofing work at the Carhouse.

    Applied May 27, 2019 · issued Jun 20, 2019 · completed Sep 17, 2020 · Permit 19 113016 BLD (revision 01)

    Closed
  • Addition or alteration · Addition(s)

    Revision 01: Revision to add a staircase to provide an access from an existing platformProposal for a 1 storey south addition and 1 storey north addition for the storage and maintenance of subway cars in existing car house

    Applied Apr 10, 2019 · issued Jul 2, 2019 · completed Sep 7, 2022 · Permit 16 182193 BLD (revision 01)

    Closed
  • Addition or alteration · Other

    Installation of guardrailings including associated roofing and flashing work at the Carhouse and Way Bldgs. within Toronto Transit Commission's Greenwood Yard. Convenience address is 29 Lascelles Blvd.

    Applied Feb 7, 2019 · issued Mar 29, 2019 · completed Sep 17, 2020 · Permit 19 113016 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposed basement level replacement of sump pumps and piping at three (3) existing sump pits at the Davisville Carhouse (two groundwater sumps and one sanitary sump) including waterproofing of sumps and the installation of a new pump control panel at each sump pit location.

    Applied Oct 30, 2017 · issued Feb 5, 2018 · Permit 17 255350 HVA

    Inspections under way
  • Plumbing

    Plumbing - Proposed basement level replacement of sump pumps and piping at three (3) existing sump pits at the Davisville Carhouse (two groundwater sumps and one sanitary sump) including waterproofing of sumps and the installation of a new pump control panel at each sump pit location.

    Applied Oct 30, 2017 · issued Feb 5, 2018 · completed Jan 16, 2019 · Permit 17 255350 PLB

    Closed
  • Addition or alteration · Multiple projects

    Proposed basement level replacement of sump pumps and piping at three (3) existing sump pits at the Davisville Carhouse (two groundwater sumps and one sanitary sump) including waterproofing of sumps and the installation of a new pump control panel at each sump pit location.

    Applied Oct 30, 2017 · issued Feb 5, 2018 · completed Jan 15, 2019 · Permit 17 255350 BLD

    Closed
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Proposal for a 1 storey south addition and 1 storey north addition for the storage and maintenance of subway cars in existing car house

    Applied Jul 15, 2016 · completed Sep 6, 2017 · Permit 16 182193 FSU

    Closed
  • Drains and site services · Inside and outside drains

    Drain - Proposal for a 1 storey south addition and 1 storey north addition for the storage and maintenance of subway cars in existing car house

    Applied Jun 28, 2016 · issued Jul 28, 2016 · completed Jul 21, 2022 · Permit 16 182193 STS

    Closed
Show 9 more permits
  • Addition or alteration · Addition(s)

    Proposal for a 1 storey south addition and 1 storey north addition for the storage and maintenance of subway cars in existing car house

    Applied Jun 28, 2016 · issued Jul 15, 2016 · completed Sep 7, 2022 · Permit 16 182193 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for a 1 storey south addition and 1 storey north addition for the storage and maintenance of subway cars in existing car house

    Applied Jun 28, 2016 · issued Jul 28, 2016 · completed Aug 8, 2022 · Permit 16 182193 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for a 1 storey south addition and 1 storey north addition for the storage and maintenance of subway cars in existing car house

    Applied Jun 28, 2016 · issued Jul 28, 2016 · completed Jul 21, 2022 · Permit 16 182193 PLB

    Closed
  • Addition or alteration · Other

    Proposal to erect a pre-fabricated building (shed) used for a welding shop - "Davisville Yard". See related permit 15-180588 BLD for foundation.Convenience address is 29 Lascelles Blvd.

    Applied Nov 12, 2015 · issued Jan 6, 2016 · completed Apr 7, 2017 · Permit 15 250514 BLD

    Closed
  • Drains and site services · Site service

    Revision #1 to the site servicesProposed installation of a new storm sewer system and the replacement of existing on site fire main for TTC Davisville Yard.

    Applied May 12, 2015 · issued Jun 24, 2015 · Permit 14 193914 STS (revision 01)

    Revision issued
  • Drains and site services · Site service

    Proposed installation of a new storm sewer system and the replacement of existing on site fire main for TTC Davisville Yard.

    Applied Jul 21, 2014 · issued Aug 15, 2014 · Permit 14 193914 STS

    Inspections under way
  • Addition or alteration · Interior alterations

    replace existing track floor slab and car wash equipment.

    Applied Jun 12, 2003 · issued Jun 20, 2003 · Permit 03 144161 BLD

    Inspections under way
  • Addition or alteration · Other

    carry out roof rehabilitation at davisville carhouse

    Applied Mar 4, 2003 · issued Apr 4, 2003 · Permit 03 112509 BLD

    Inspections under way
  • Plumbing · Unknown

    Install 4" sanitary and 6" storm drains, 2 area drains, 6 floor drains, 5 roof drains. See bp# 423747 plans

    Applied Sep 1, 1999 · issued Sep 13, 1999 · Permit 99 020818 PLB

    Permit issued

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 45 Balliol Street

    40 storeys · 477 homes · Residential

    140 m away · Site plan · Under review · filed Nov 8, 2021

    Under review
  • 50-64 Merton Street

    46 storeys · 581 homes · Mixed use

    150 m away · Rezoning · Under appeal · filed Aug 31, 2022

    Under appeal
  • 50-64 Merton Street

    40 storeys · 505 homes · Mixed use

    150 m away · Condominium · Under review · filed Nov 3, 2021

    Under review
  • 22 Balliol Street

    40 storeys · 414 homes · Mixed use

    160 m away · Site plan · Under review · filed Apr 19, 2022

    Under review
  • 1910-1920 Yonge Street

    48 storeys · 939 homes · Mixed use

    210 m away · Site plan · Under review · filed Nov 5, 2021

    Under review
  • 17-25 Lascelles Boulevard

    10 homes · Residential

    220 m away · Condominium · Approved · filed Oct 8, 2021

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 30 Merton St · Consent

    To obtain consent to sever the property into three stratified lots (commercial parking lands, retail lands, and residential lands) and to create various easements/rights-of-ways for the approved 37-storey mixed-use building with a three level below grade parking garage (currently under construction).

    120 m away · filed Jul 23, 2026 · Hearing scheduled

  • 33 Davisville Ave · Consent

    To obtain consent to sever the property into two lots, to maintain existing easements/rights-of-way as well as to create new easements/rights-of-way.

    240 m away · filed May 2, 2024 · Approved

  • 20 Gormley Ave · Consent

    To obtain consent to sever the property into two undersized residential lots.

    250 m away · filed Aug 17, 2023 · Approved

  • 20 Gormley Ave · Minor variance

    To construct a new three-storey semi-detached dwelling with a front porch and a rear ground floor deck. Also, to construct a new one-storey ancillary building (semi-detached garage) in the rear yard, abutting Brentdale Drive.

    250 m away · filed Aug 17, 2023 · Approved

  • 20 Gormley Ave · Minor variance

    To construct a new three-storey semi-detached dwelling with a front porch and a rear ground floor deck. Also, to construct a new one-storey ancillary building (semi-detached garage) in the rear yard, abutting Brentdale Drive.

    250 m away · filed Aug 17, 2023 · Approved

  • 1913 Yonge St · Minor variance

    To legalize and to maintain the shed that has been constructed between the two-storey building and the detached garage, without the benefit of a building permit.

    220 m away · filed Feb 24, 2022 · Approved

  • 45 Balliol St · Minor variance

    The existing residential apartment building site (Site A), located on the retained lands, being Parts 1 and 4 in Application B0059/21TEY, will not be altered but will require variance approval.

    150 m away · filed May 9, 2021 · Approved

  • 45 Balliol St · Consent

    To obtain consent for a strata severance and to create easements/rights-of-way.

    150 m away · filed May 9, 2021 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.