Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 19, Beaches-East York

181 Wheeler Ave

The City of Toronto has 6 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Proposal to install a back water valve

    Applied Jan 29, 2018 · issued Jan 29, 2018 · completed Jan 31, 2018 · Permit 18 111161 DRN

    Closed
  • Heating and ventilation

    HVAC Revision - Proposed one storey addition in rear, second storey addition, basement finishing, interior alterations.

    Applied Feb 2, 2017 · issued Feb 7, 2017 · completed Jun 26, 2017 · Permit 16 249102 HVA (revision 01)

    Closed
  • Small residential project · Multiple projects

    REVISION - to add a support wall to the columns of the carportProposed one storey addition in rear, second storey addition, basement finishing, interior alterations.

    Applied Jan 5, 2017 · issued Jan 18, 2017 · completed Jul 31, 2017 · Permit 16 249102 BLD (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposed one storey addition in rear, second storey addition, basement finishing, interior alterations.

    Applied Nov 9, 2016 · issued Nov 25, 2016 · completed Jun 26, 2017 · Permit 16 249102 HVA

    Closed
  • Plumbing

    Plumbing - Proposed one storey addition in rear, second storey addition, basement finishing, interior alterations.

    Applied Nov 9, 2016 · issued Nov 21, 2016 · completed Jun 26, 2017 · Permit 16 249102 PLB

    Closed
  • Small residential project · Multiple projects

    Proposed one storey addition in rear, second storey addition, basement finishing, interior alterations.

    Applied Nov 9, 2016 · issued Nov 21, 2016 · completed Jul 31, 2017 · Permit 16 249102 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 346 Lee Avenue

    3 homes · Not stated in the file

    160 m away · Condominium · Under review · filed May 16, 2023

    Under review
  • 507-511 Kingston Road

    Not stated in the file

    180 m away · Site plan · Approved · filed Mar 15, 2022

    Approved
  • 558-564 Kingston Road

    8 storeys · 57 homes · Residential

    270 m away · Rezoning · Under review · filed Apr 23, 2021

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 113 Bellefair Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear three-storey addition (with a rear ground floor deck), a side (north) one-storey addition (rear extension to the existing attached garage) with a basement walkout, and a dormer on the south side.

    220 m away · filed Jan 23, 2026 · Approved

  • 342 Lee Ave · Minor variance

    To permit and maintain the existing rear ground floor deck (pie-shaped) of the two-and-one-half-storey semi-detached dwelling, abutting the rear (west) and sides (north and south) of the lot.

    180 m away · filed Jan 7, 2026 · Approved

  • 322 Waverley Rd · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear one-storey addition (including basement extension with walkout), a rear deck with stairs, a rear second storey terrace extension, and a rear third storey addition with a terrace.

    210 m away · filed Dec 5, 2025 · Approved

  • 302 Lee Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition (sunroom), and a rear ground floor deck with stairs. The existing rear ground floor deck will be demolished.

    60 m away · filed May 8, 2025 · Approved

  • 5 Leonard Crcl · Minor variance

    To alter the existing two-storey detached dwelling by constructing a side (north) second storey addition (over the existing garage) and a rear one-storey addition (at the southeast portion of the dwelling).

    170 m away · filed Nov 20, 2024 · Approved

  • 169 Wheeler Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a ground floor deck and stairs and a second storey bay window.

    30 m away · filed Nov 12, 2024 · Approved

  • 318 Waverley Rd · Minor variance

    To construct an ancillary building in the rear yard of the property, abutting the laneway. The main level will occupy one parking space and there will be exterior stairs leading to a second level loft/studio space. Also, a green roof will be installed above the one-storey portion of this building. The existing shed and gate will be demolished.

    210 m away · filed Oct 31, 2024 · Approved

  • 507 Kingston Rd · Minor variance

    To alter the development standards for the 8-storey residential building with three levels of underground parking (as approved under Site Specific Zoning By-laws 371-2020 and 372-2020) by increasing the total number of dwelling units from 30 to 90 dwelling units, the overall building height by 3.2 m (8-storeys will be maintained), the height of mechanical penthouse elements/architectural feature projections, residential gross floor area, indoor and outdoor amenity space, and modifying the building envelope (setbacks and step-backs) and parking standards as well as changing the vehicular acces…

    180 m away · filed Jun 19, 2024 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.