Toronto address · Ward 16, Don Valley East
182 Cottonwood Dr
The City of Toronto has 7 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposed addition on the ground floor and an addition of a new integral garage to an existing single family detached dwelling.
Applied Dec 27, 2023 · issued Mar 11, 2024 · completed Dec 3, 2024 · Permit 23 238769 HVA
- Closed
Small residential project · Other
Proposed addition on the ground floor and an addition of a new integral garage to an existing single family detached dwelling.
Applied Dec 27, 2023 · issued Feb 9, 2024 · completed Dec 3, 2024 · Permit 23 238769 BLD
- Closed
Plumbing
Plumbing - Proposed addition on the ground floor and an addition of a new integral garage to an existing single family detached dwelling.
Applied Dec 27, 2023 · issued Feb 9, 2024 · completed Dec 3, 2024 · Permit 23 238769 PLB
- Cancelled
Plumbing
Plumbing - Proposed addition on the ground floor and an addition of a new integral garage to an existing single family detached dwelling.
Applied Nov 30, 2023 · completed Dec 7, 2023 · Permit 23 231532 PLB
- Cancelled
Heating and ventilation
HVAC - Proposed addition on the ground floor and an addition of a new integral garage to an existing single family detached dwelling.
Applied Nov 30, 2023 · completed Dec 7, 2023 · Permit 23 231532 HVA
- Cancelled
Small residential project · Addition(s)
Proposed addition on the ground floor and an addition of a new integral garage to an existing single family detached dwelling.
Applied Nov 30, 2023 · completed Dec 7, 2023 · Permit 23 231532 BLD
- Closed
Small residential project · Other
Rooftop solar panel installation
Applied Aug 10, 2011 · issued Jan 17, 2012 · completed Jan 19, 2017 · Permit 11 254377 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a one storey addition with an enclosed garage to the rear and east side of the existing dwelling.
Decision: Approved (hearing Jul 27, 2023)
Filed May 1, 2023 · File A0325/23NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
171 Cottonwood Dr · Minor variance
To alter the existing one-storey detached dwelling by constructing a one-storey (garage) addition to the east side.
110 m away · filed Feb 10, 2026 · Approved
9 Embla St · Minor variance
Proposal to construct a new semi-detached dwelling with attached garage and full basement
200 m away · filed Jan 16, 2024 · Approved
81 Cottonwood Dr · Minor variance
To construct front and rear additions to the existing dwelling.
140 m away · filed Jun 17, 2021 · Approved
22 Foxden Rd · Minor variance
To construct a one storey rear addition and a second floor addition.
190 m away · filed May 21, 2021 · Approved
179 Cottonwood Dr · Minor variance
To construct a second floor addition and a rear deck.
70 m away · filed Jan 30, 2020 · Approved
80 Southill Dr · Minor variance
To construct a two storey side addition with garage.
70 m away · filed Nov 23, 2019 · Approved
168 Cottonwood Dr · Minor variance
To legalize and maintain an existing deck.
120 m away · filed May 15, 2017 · Refused
16 Foxden Rd · Minor variance
To legalize and maintain the existing carport and detached garage. Please be advised this application was previously before the Committee of Adjustment on April 7, 2016. It was the decision of the Committee to defer the application sine die at the request of the applicant in order to meet with the neighbours to discuss the variances.
150 m away · filed Feb 16, 2016 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.