Toronto address · Ward 14, Toronto-Danforth
183 Monarch Park Ave
The City of Toronto has 5 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Underpinning
Rev 01: Plans showing wall finishings in basement floor plan.
Applied Jan 28, 2022 · issued Mar 2, 2022 · completed Jun 17, 2022 · Permit 21 181465 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Proposal to underpin the foundation of an existing SFD-semi dwelling. Basement to remain unfinished.
Applied Nov 4, 2021 · issued Dec 13, 2021 · completed Jun 9, 2022 · Permit 21 181465 HVA
- Closed
Plumbing
Plumbing - Proposal to underpin the foundation of an existing SFD-semi dwelling. Basement to remain unfinished.
Applied Jul 8, 2021 · issued Jul 16, 2021 · completed Jun 9, 2022 · Permit 21 181465 PLB
- Closed
Small residential project · Underpinning
Proposal to underpin the foundation of an existing SFD-semi dwelling. Basement to remain unfinished.
Applied Jul 8, 2021 · issued Jul 16, 2021 · completed Jun 17, 2022 · Permit 21 181465 BLD
- Closed
Drains and site services
Drain - Proposal to underpin the foundation of an existing SFD-semi dwelling. Basement to remain unfinished.
Applied Jul 8, 2021 · issued Jul 16, 2021 · completed Jun 9, 2022 · Permit 21 181465 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
245 Strathmore Blvd · Minor variance
To construct a new two-storey detached ancillary building (containing one laneway suite) cantilevered at the southeast portion of the second storey, abutting the laneway. There will be one undersized vehicular parking space (located below the cantilevered portion of the ancillary building), with a new rear driveway abutting the laneway at the southeast portion of the lot. There will be a total of three residential dwelling units on this lot (two units within the main house, and one unit within the ancillary building).
230 m away · filed May 4, 2026 · Approved
295 Strathmore Blvd · Minor variance
To construct a new two-storey ancillary building containing one parking space and one laneway suite, with a second storey balcony, in the rear yard, abutting the laneway. There will be a total of two residential dwelling units on this lot (one unit within the main house and one unit within the ancillary building).
190 m away · filed Jul 15, 2024 · Approved
1474 Danforth Ave · Minor variance
To alter the existing two-storey mixed-use building by constructing a second storey addition with a rear second storey terrace and a front rooftop terrace.
240 m away · filed May 15, 2023 · Approved
156 Monarch Park Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition with a rear deck, and a front yard basement walkout.
110 m away · filed Mar 9, 2023 · Approved
357 Milverton Blvd · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition, a three-storey rear addition to replace the existing one-storey rear addition, and a new rear deck.
130 m away · filed Sep 9, 2022 · Approved
214 Monarch Park Ave · Minor variance
To construct a new three-storey detached dwelling with a front covered porch and a rear deck with a retractable awning.
60 m away · filed Aug 4, 2022 · Approved
82 Springdale Blvd · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition with a rear deck.
250 m away · filed Feb 9, 2022 · Approved
205 Monarch Park Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a third storey rear addition with a rear balcony, a rear ground floor deck and a new rear basement walkout. Also, to partially enclose the existing front porch.
90 m away · filed Dec 9, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.