The City of Toronto has 5 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposed interior alterations to all floors
Applied Mar 7, 2023 · issued Mar 20, 2023 · completed May 4, 2026 · Permit 22 223247 HVA (revision 01)
- Closed
Heating and ventilation
HVAC - Proposed interior alterations to all floors
Applied Jan 4, 2023 · issued Jan 31, 2023 · completed May 4, 2026 · Permit 22 223247 HVA
- Closed
Drains and site services
Drain - Proposed interior alterations to all floors
Applied Oct 28, 2022 · issued Dec 2, 2022 · completed Jul 8, 2025 · Permit 22 223247 DRN
- Closed
Plumbing
Plumbing - Proposed interior alterations to all floors
Applied Oct 28, 2022 · issued Dec 2, 2022 · completed May 4, 2026 · Permit 22 223247 PLB
- Closed
Small residential project · Interior alterations
Proposed interior alterations to all floors
Applied Oct 28, 2022 · issued Dec 2, 2022 · completed May 15, 2026 · Permit 22 223247 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
264 Beech Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition (with a front and rear balcony, and a side (north) courtyard). Also, to construct a new front porch with stairs. The existing front second storey balcony will be demolished, and the lawfully existing front yard parking pad will be maintained.
240 m away · filed Jul 21, 2026 · Hearing scheduled
163 Balsam Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a front one-storey addition (front porch enclosure), a new front porch with stairs, a front second storey balcony, and a rear one-storey addition (below the existing cantilevered second storey).
240 m away · filed Dec 4, 2024 · Approved
153 Willow Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear ground floor deck and a rear second floor deck.
210 m away · filed Oct 30, 2024 · Approved
97 Spruce Hill Rd · Minor variance
To construct a new two-storey ancillary building (containing a one-car garage, and one laneway suite), in the rear yard, abutting the laneway. The existing shed will be demolished.
50 m away · filed May 6, 2024 · Approved
4 Pine Ter · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a third storey addition (dormer).
190 m away · filed Sep 27, 2022 · Approved
185 Beech Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition with a deck.
50 m away · filed Mar 23, 2022 · Approved
18 Cedar Ave · Minor variance
To alter the existing detached garage in the rear yard by constructing a new rooftop deck with stairs.
140 m away · filed Jan 27, 2022 · Approved
113 Balsam Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a front and rear basement addition and interior alterations to the basement to accommodate an undersized integral garage.
140 m away · filed Jan 24, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.