Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 5, York South-Weston

1850 Jane St

The City of Toronto has 9 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Addition(s)

    Revision 04: Revision to correct labelling of use of room names on drawings A2 and A2a. Existing ground floor "retail space" is correct and "homeowner-occupied space" is taken out (was wrongly labelled in 2010 permit). This is to agree with the existing 1990 permit as no changes were made to basement and the main floor.

    Applied Aug 20, 2015 · issued Aug 16, 2016 · completed Feb 16, 2024 · Permit 10 138963 BLD (revision 04)

    Closed
  • Addition or alteration · Addition(s)

    Revision 03: Revision to attached garage setback and structural framing for second floor.(Demolish existing residential upper floor walls and roof and add second floor addition to an existing commercial on main floor and one residential apt. on second floor)

    Applied Dec 23, 2011 · issued Oct 1, 2014 · completed Feb 16, 2024 · Permit 10 138963 BLD (revision 03)

    Closed
  • Heating and ventilation

    REVISION #2 to change location of duct work from within dropped ceiling to attic space and calculations.HVAC - demolish existing residential upper floor walls and roof and add second floor addition to an existing commercial on main floor and one residential apt. on second floor

    Applied Jun 6, 2011 · issued Jul 6, 2011 · completed Feb 16, 2024 · Permit 10 138963 HVA (revision 02)

    Closed
  • Heating and ventilation

    REVISION #1 to relocate mechanical room on second floor.HVAC - demolish existing residential upper floor walls and roof and add second floor addition to an existing commercial on main floor and one residential apt. on second floor

    Applied Mar 29, 2011 · issued Apr 4, 2011 · completed Feb 16, 2024 · Permit 10 138963 HVA (revision 01)

    Closed
  • Addition or alteration · Addition(s)

    REVISION #2 to relocate mechanical room and move wall between bathroom and kitchen on second floor.Demolish existing residential upper floor walls and roof and add second floor addition to an existing commercial on main floor and one residential apt. on second floor)

    Applied Mar 29, 2011 · issued Apr 19, 2011 · completed Feb 16, 2024 · Permit 10 138963 BLD (revision 02)

    Closed
  • Addition or alteration · Addition(s)

    Revision 01: To change roof construction from conventional to truss framing. (demolish existing residential upper floor walls and roof and add second floor addition to an existing commercial on main floor and one residential apt. on second floor)

    Applied Aug 26, 2010 · issued Oct 4, 2010 · completed Feb 16, 2024 · Permit 10 138963 BLD (revision 01)

    Closed
  • Addition or alteration · Addition(s)

    demolish existing residential upper floor walls and roof and add second floor addition to an existing commercial on main floor and one residential apt. on second floor

    Applied Mar 25, 2010 · issued Jun 28, 2010 · completed Feb 16, 2024 · Permit 10 138963 BLD

    Closed
  • Heating and ventilation

    HVAC - demolish existing residential upper floor walls and roof and add second floor addition to an existing commercial on main floor and one residential apt. on second floor

    Applied Mar 25, 2010 · issued Jun 28, 2010 · completed Feb 16, 2024 · Permit 10 138963 HVA

    Closed
  • Plumbing

    Plumbing - demolish existing residential upper floor walls and roof and add second floor addition to an existing commercial on main floor and one residential apt. on second floor

    Applied Mar 25, 2010 · issued Jun 28, 2010 · completed Feb 16, 2024 · Permit 10 138963 PLB

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 1747-1773 Jane Street

    14 storeys · Mixed use

    370 m away · Rezoning · Under review · filed Mar 11, 2026

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 222 King St · Consent

    To obtain consent to sever the lot into two undersized residential lots.

    50 m away · filed Jun 10, 2025 · Approved

  • 222 King St · Minor variance

    To construct a new duplex with an attached garage.

    50 m away · filed Jun 10, 2025 · Approved

  • 222 King St · Minor variance

    To construct a new duplex with an attached garage.

    50 m away · filed Jun 10, 2025 · Approved

  • 145 Woodward Ave · Minor variance

    To construct a third storey addition to include an additional 6 dwelling units. A total of 17 dwelling units will be provided.

    190 m away · filed Sep 25, 2022 · Refused

  • 245 John St · Consent

    To obtain consent to sever the property into two undersized residential lots.

    250 m away · filed Apr 27, 2022 · Approved

  • 245 John St · Minor variance

    To construct a new detached dwelling with an attached garage.

    250 m away · filed Apr 27, 2022 · Approved

  • 245 John St · Minor variance

    To construct a new detached dwelling with an attached garage.

    250 m away · filed Apr 27, 2022 · Approved

  • 253 John St · Minor variance

    To construct a two-storey rear addition, a complete third floor addition and to convert the existing single family dwelling into a triplex dwelling.

    240 m away · filed Aug 9, 2020 · Deferred

Everything planned in York South-Weston

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.