Toronto address · Ward 21, Scarborough Centre
1860 Midland Ave
The City of Toronto has 8 building permits since 2017 (7 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Examiner's notice sent
Addition or alteration · Other
Construction of an exterior loading dock ramp on the south side of the building, including the installation of a covered canopy structure above the ramp.
Applied Jul 15, 2024 · Permit 24 180683 BLD
- Inspections under way
Addition or alteration · Other
Masonry Restoration
Applied Jan 24, 2024 · issued Feb 12, 2024 · Permit 24 107833 BLD
- Inspections under way
Drains and site services · Inside and outside drains
Drain - loading dock modifications - demolish portion of loading dock wall and rebuild wall to accommodate 6 new 8x10 overhead doorsNew trench drain and connection to existing storm system
Applied Jun 1, 2016 · issued Jun 30, 2016 · Permit 16 165792 STS
- Inspections under way
Addition or alteration · Interior alterations
loading dock modifications - demolish portion of loading dock wall and rebuild wall to accommodate 6 new 8x10 overhead doors, add new trench drain
Applied Jun 1, 2016 · issued Jun 30, 2016 · Permit 16 165792 BLD
- Inspections under way
Heating and ventilation
HVAC - loading dock modifications - demolish portion of loading dock wall and rebuild wall to accommodate 6 new 8x10 overhead doors
Applied Jun 1, 2016 · issued Jun 30, 2016 · Permit 16 165792 HVA
- Inspections under way
Plumbing · Backflow prevention devices (Water only)
install one 2" backflow preventor for CANADA POST
Applied Apr 2, 2013 · issued Apr 24, 2013 · Permit 13 142857 PSA
- Inspections under way
Addition or alteration · Interior alterations
interior alterations to the ground floor offices portion of canada post distribution facility.no work on second floor. no change to occupancy No Plumbing
Applied Aug 18, 2008 · issued Jan 26, 2009 · Permit 08 194664 BLD
- Closed
Heating and ventilation
HVAC - interior alterations to the ground floor offices portion of canada post distribution facility.no work on second floor. no change to occupancy No Plumbing
Applied Aug 18, 2008 · issued Jan 26, 2009 · completed Apr 24, 2026 · Permit 08 194664 HVA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
21 Canadine Rd · Minor variance
To construct a front yard addition with a secondary suite.
240 m away · filed Jun 12, 2024 · Approved
56 Oakley Blvd · Minor variance
To construct a rear yard addition to the existing dwelling.
210 m away · filed Dec 29, 2023 · Approved
490 Midwest Rd · Minor variance
To permit the custom packaging company at 490 Midwest Road to expand its business to include the packaging of marihuana related products.
210 m away · filed Nov 27, 2019 · Approved
1810 Midland Ave · Minor variance
To permit a furniture manufacturer, wholesaler and retailer to increase the area of their retail showroom.
200 m away · filed Jul 19, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.