Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

187 Queen St E

The City of Toronto has 5 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    Revision to replace heating system with VRV system.

    Applied Dec 12, 2012 · issued Dec 14, 2012 · completed Nov 25, 2020 · Permit 11 320930 HVA (revision 01)

    Closed
  • Addition or alteration · Multiple projects

    REVISION - structural changes to the foundation and add an elevator.Proposal to construct rear three storey addtion w/ carport on ground floor and second and third floor office spaces. Propoasl includes interior alterations to all floors.

    Applied Feb 16, 2012 · issued Mar 21, 2012 · completed Dec 8, 2020 · Permit 11 320930 BLD (revision 01)

    Closed
  • Addition or alteration · Multiple projects

    Proposal to construct rear three storey addtion w/ carport on ground floor and second and third floor office spaces. Propoasl includes interior alterations to all floors.

    Applied Dec 5, 2011 · issued Jan 30, 2012 · completed Dec 8, 2020 · Permit 11 320930 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal to construct rear three storey addtion w/ carport on ground floor and second and third floor office spaces. Propoasl includes interior alterations to all floors.

    Applied Dec 5, 2011 · issued Jan 30, 2012 · completed Nov 25, 2020 · Permit 11 320930 HVA

    Closed
  • Plumbing

    Plumbing - Proposal to construct rear three storey addtion w/ carport on ground floor and second and third floor office spaces. Propoasl includes interior alterations to all floors.

    Applied Dec 5, 2011 · issued Jan 30, 2012 · completed Nov 25, 2020 · Permit 11 320930 PLB

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 125 George St · Consent

    To obtain consent to create a new stratified easement/right-of-way.

    150 m away · filed Jun 2, 2026 · Hearing scheduled

  • 134 Jarvis St · Minor variance

    To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.

    200 m away · filed Sep 4, 2025 · Approved

  • 90 Queen St E · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-laws 218-2021 and 219-2021), for a new 34-storey mixed-use building (which is currently under construction), by reducing the minimum number of vehicular parking spaces. There will be a total of 369 residential dwelling units on this lot.

    240 m away · filed Aug 19, 2024 · Approved

  • 150 Sherbourne St · Minor variance

    To construct a new four-storey detached building (community recreation centre).

    170 m away · filed Jun 6, 2024 · Approved

  • 167 Queen St E · Minor variance

    To alter the existing three-storey mixed-use building by converting the second and third storey from a Residential use (a total of 5 dwelling units) into a Hotel use (a total of 10 rooms). Also, to construct a Personal Service Shop use within the basement. In addition, to convert the existing rear third storey terrace into an exterior amenity space by constructing a new canopy.

    40 m away · filed Mar 13, 2024 · Approved

  • 348 Richmond St E · Minor variance

    To alter the development standards, as approved under Site Specific Zoning By-Law 227-2023 (amended By-Law 569-2013), for the 25-storey mixed-use apartment building (Building A), by increasing the residential gross floor area, and reducing the number of vehicular parking spaces. A hotel use will not be contained within this building (Building A).

    230 m away · filed Oct 13, 2023 · Approved

  • 236 Queen St E · Minor variance

    To alter the existing three-storey, mixed-use building by constructing rear second and third storey additions with a rear third storey balcony. The altered building will contain a total of four dwelling units.

    230 m away · filed Oct 3, 2023 · Approved

  • 8 Britain St · Minor variance

    To alter the existing two-unit, four-storey residential building by reconstructing the existing partial fourth floor and converting the building into a four-storey commercial building for retail uses.

    40 m away · filed Apr 7, 2022 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.