Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

1871 Davenport Rd

The College St Church Of God

The City of Toronto has 4 building permits since 2017 (4 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - PROPOSAL TO CONSTRUCT A 3 LEVEL ADDITION TO EXISTING ONE STOREY COMMERCIALWAREHOUSE

    Applied May 14, 2026 · Permit 25 142131 PLB

    Issuance pending
  • Heating and ventilation

    Hvac - proposal to construct a 3 level addition to existing one storey commercialwarehouse

    Applied May 14, 2026 · Permit 25 142131 HVA

    Issuance pending
  • Development charges deferral

    Deferred Fees from folder 25 142131 (RSN-5612764) ZoningProcess RSN 77395937

    Applied Feb 5, 2026 · Permit 26 142131 BLD

    Open
  • Conditional permit · Addition(s)

    Conditional Permit - Proposal to construct a 3-level addition to existing one-storey commeical warehouse.

    Applied Dec 15, 2025 · Permit 25 142131 BLD

    Not started

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · NR addition

    To alter the existing one-storey building by constructing complete second, third, and fourth storey additions, and a rear fourth storey terrace. This building will be converted into a mixed-use building for a total of 10 residential dwelling units and retail uses on this lot.

    Decision: Approved (hearing Jan 8, 2025)

    Filed Aug 27, 2024 · File A0767/24TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 50 Laughton Ave · Minor variance

    To legalize and to maintain the front porch with stairs and rear ground floor two-level deck with stairs, which were constructed without an authorized building permit.

    210 m away · filed Sep 14, 2026 · Postponed

  • 1859 Davenport Rd · Minor variance

    To construct a new three-storey mixed-use building with three rooftop mezzanines and three rooftop terraces. There will be a total of one commercial unit (located on the first level), and eight residential dwelling units on this lot (two units occupying the basement and first levels, three units occupying the second level, and three units occupying the third level).

    30 m away · filed Mar 13, 2026 · Approved

  • 1927 Davenport Rd · Minor variance

    To legalize and to maintain the conversion of a two-storey, two-unit, mixed-use building into a four-unit mixed-use building. The construction (without an authorized building permit) included rear basement, ground, and second storey additions as well as a side (east) deck. There is currently an eating establishment, a personal service shop, and four residential dwelling units on this lot.

    190 m away · filed Feb 9, 2024 · Approved

  • 64 Laughton Ave · Minor variance

    To construct a cantilevered second storey addition to the existing one-storey ancillary building (semi-detached garage), in the rear yard, abutting the laneway. This ancillary building will have one laneway suite on the second level.

    200 m away · filed Aug 16, 2023 · Approved

  • 534 Perth Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a two-storey north side and rear addition, a complete third storey addition with a walkout rooftop deck, a covered front porch with a walkout basement, a front second floor balcony, and a rear ground level covered deck.

    140 m away · filed Jan 5, 2023 · Approved

  • 36 Laughton Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a third storey addition with a rear third storey deck, a new rear ground level deck, and a new covered front porch.

    230 m away · filed Jul 4, 2022 · Approved

  • 1921 Davenport Rd · Minor variance

    To construct a new five-storey mixed-use building with 2 commercial units and 19 residential units. The existing one-storey commercial building will be demolished.

    150 m away · filed Oct 22, 2021 · Approved

  • 113 Laughton Ave · Minor variance

    To construct a new one-storey ancillary building (detached garage) in the rear yard of the property. The existing rear detached garage will be demolished.

    180 m away · filed Oct 1, 2021 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.