Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 5, York South-Weston

19 Hafis Rd

The City of Toronto has 11 building permits since 2017 (8 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation · Special ventilation system

    Proposal for a new contiuous fryer and exhaust fan in an existing bakery - KSB BAKERY

    Applied Apr 15, 2025 · issued Jun 25, 2025 · Permit 25 144889 MSA

    Permit issued
  • Heating and ventilation · Special ventilation system

    Proposed two - 9ft - 6 inch commercial exhaust hood, and ventilation system.Related to Permit 25 142657 BLD 00 BA (structural reinforcement of roof).

    Applied Apr 10, 2025 · issued Jun 25, 2025 · Permit 25 142613 MSA

    Permit issued
  • Addition or alteration · Interior alterations

    Proposed roof structural reinforcements for mechanical rooftop units.Related to permit 25 142613 MSA 00 MS

    Applied Apr 10, 2025 · issued Jul 9, 2025 · Permit 25 142657 BLD

    Permit issued
  • Addition or alteration · Interior alterations

    Proposal for structural reinforcement of existing joists to accomodate new 2-11'-6" commercial exhaust hood, and ventilation system

    Applied Jan 2, 2025 · issued Jan 30, 2025 · Permit 25 100320 BLD

    Permit issued
  • Heating and ventilation · Special ventilation system

    proposal for new 2-11'-6" commercial exhaust hood, and ventilation system

    Applied Oct 16, 2024 · issued Jan 31, 2025 · completed Sep 18, 2025 · Permit 24 226793 MSA

    Closed
  • Plumbing · Manholes/Catch Basins/Sumps/Interceptors

    Install interceptor

    Applied Sep 13, 2022 · issued Oct 13, 2022 · Permit 22 202723 PSA

    Permit issued
  • Plumbing · Manholes/Catch Basins/Sumps/Interceptors

    Install interceptor

    Applied Jul 5, 2022 · completed Aug 9, 2022 · Permit 22 172090 PSA

    Cancelled
  • Addition or alteration · Interior alterations

    Interior alterations to existing industrial building

    Applied May 2, 2022 · Permit 22 140597 BLD

    Under review
  • Heating and ventilation

    HVAC - Interior alterations to existing industrial building

    Applied May 2, 2022 · completed Sep 8, 2024 · Permit 22 140597 HVA

    Cancelled
  • Plumbing

    Plumbing - Interior alterations to existing industrial building

    Applied May 2, 2022 · Permit 22 140597 PLB

    Issuance pending
  • Plumbing · Backflow prevention devices (Water only)

    (1) backflow prevention device( 1") in meter room on ground floor north east corner of building

    Applied Jul 28, 2011 · issued Oct 13, 2011 · Permit 11 247883 PSA

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 15 Sheffield St · Consent

    To obtain consent to create an easement/ right-of-way.

    190 m away · filed Apr 28, 2022 · Approved

  • 26 Eugene St · Minor variance

    To construct a second storey addition over the existing dwelling, in conjunction with a new rear deck. The applicant is also proposing other interior and exterior alterations including a proposed secondary suite.

    250 m away · filed Jun 30, 2020 · Approved

  • 20 Hafis Rd · Minor variance

    To permit an open patio.

    80 m away · filed Feb 28, 2019 · Deferred

Everything planned in York South-Weston

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.