Toronto address · Ward 5, York South-Weston
19 Hafis Rd
The City of Toronto has 11 building permits since 2017 (8 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Heating and ventilation · Special ventilation system
Proposal for a new contiuous fryer and exhaust fan in an existing bakery - KSB BAKERY
Applied Apr 15, 2025 · issued Jun 25, 2025 · Permit 25 144889 MSA
- Permit issued
Heating and ventilation · Special ventilation system
Proposed two - 9ft - 6 inch commercial exhaust hood, and ventilation system.Related to Permit 25 142657 BLD 00 BA (structural reinforcement of roof).
Applied Apr 10, 2025 · issued Jun 25, 2025 · Permit 25 142613 MSA
- Permit issued
Addition or alteration · Interior alterations
Proposed roof structural reinforcements for mechanical rooftop units.Related to permit 25 142613 MSA 00 MS
Applied Apr 10, 2025 · issued Jul 9, 2025 · Permit 25 142657 BLD
- Permit issued
Addition or alteration · Interior alterations
Proposal for structural reinforcement of existing joists to accomodate new 2-11'-6" commercial exhaust hood, and ventilation system
Applied Jan 2, 2025 · issued Jan 30, 2025 · Permit 25 100320 BLD
- Closed
Heating and ventilation · Special ventilation system
proposal for new 2-11'-6" commercial exhaust hood, and ventilation system
Applied Oct 16, 2024 · issued Jan 31, 2025 · completed Sep 18, 2025 · Permit 24 226793 MSA
- Permit issued
Plumbing · Manholes/Catch Basins/Sumps/Interceptors
Install interceptor
Applied Sep 13, 2022 · issued Oct 13, 2022 · Permit 22 202723 PSA
- Cancelled
Plumbing · Manholes/Catch Basins/Sumps/Interceptors
Install interceptor
Applied Jul 5, 2022 · completed Aug 9, 2022 · Permit 22 172090 PSA
- Under review
Addition or alteration · Interior alterations
Interior alterations to existing industrial building
Applied May 2, 2022 · Permit 22 140597 BLD
- Cancelled
Heating and ventilation
HVAC - Interior alterations to existing industrial building
Applied May 2, 2022 · completed Sep 8, 2024 · Permit 22 140597 HVA
- Issuance pending
Plumbing
Plumbing - Interior alterations to existing industrial building
Applied May 2, 2022 · Permit 22 140597 PLB
- Inspections under way
Plumbing · Backflow prevention devices (Water only)
(1) backflow prevention device( 1") in meter room on ground floor north east corner of building
Applied Jul 28, 2011 · issued Oct 13, 2011 · Permit 11 247883 PSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
15 Sheffield St · Consent
To obtain consent to create an easement/ right-of-way.
190 m away · filed Apr 28, 2022 · Approved
26 Eugene St · Minor variance
To construct a second storey addition over the existing dwelling, in conjunction with a new rear deck. The applicant is also proposing other interior and exterior alterations including a proposed secondary suite.
250 m away · filed Jun 30, 2020 · Approved
20 Hafis Rd · Minor variance
To permit an open patio.
80 m away · filed Feb 28, 2019 · Deferred
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.