Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 20, Scarborough Southwest

19 Lakeside Ave

The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    a new two storey side addition, to allow for an elevator shaft, to the existing two storey dwelling.

    Applied Feb 26, 2018 · issued Apr 12, 2018 · completed Oct 23, 2019 · Permit 18 121763 BLD

    Closed
  • Small residential project · Multiple projects

    Construct a covered porch at the Front and an addition to the existing garage

    Applied May 22, 2013 · issued Jun 28, 2013 · completed Jul 30, 2020 · Permit 13 172065 BLD

    Closed
  • Plumbing

    Plumbing - Construct two storey addtiont to the front and rear of the existing two storey dwelling with interior alterations. No Foundation/Footing work.

    Applied Jan 24, 2013 · issued Feb 7, 2013 · completed Jul 30, 2020 · Permit 13 110816 PLB

    Closed
  • Small residential project · Multiple projects

    Construct two storey addtiont to the front and rear of the existing two storey dwelling with interior alterations. No Foundation/Footing work.

    Applied Jan 24, 2013 · issued Feb 7, 2013 · completed Jul 30, 2020 · Permit 13 110816 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    The applicant is seeking relief from the provisions of the Zoning By-law to construct a new two storey side addition, to allow for an elevator shaft, to the existing two storey dwelling.

    Decision: Approved (hearing Oct 5, 2017)

    Filed Jul 25, 2017 · File A0274/17SC

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 3 Kingsbury Cres · Minor variance

    To demolish the existing one and a half-storey dwelling and to construct a new two-storey dwelling.

    60 m away · filed Nov 8, 2024 · Approved

  • 2 Kingsbury Cres · Minor variance

    To demolish the existing dwelling and to construct a new two storey detached dwelling.

    90 m away · filed Mar 4, 2024 · Approved

  • 30 Lakeside Ave · Minor variance

    To demolish the existing two-storey detached dwelling and construct a new three-storey detached dwelling.

    60 m away · filed Dec 19, 2023 · Refused

  • 33 Lakeside Ave · Minor variance

    To construct a second storey deck.

    20 m away · filed Dec 30, 2022 · Approved

  • 14 Kildonan Dr · Minor variance

    To replace garage and to construct a second storey addition to existing dwelling.

    180 m away · filed Nov 16, 2022 · Approved

  • 91 Lakeside Ave · Minor variance

    To construct new dwelling.

    220 m away · filed Sep 13, 2022 · Application withdrawn

  • 74 Kildonan Dr · Minor variance

    To construct a second storey addition to existing dwelling.

    210 m away · filed Jun 6, 2022 · Approved

  • 61 Kildonan Dr · Minor variance

    To permit a new two-storey south side addition and new rear deck. A previous building permit was issued to construct a two-storey rear addition and did not require variances.

    140 m away · filed Aug 13, 2020 · Approved

Everything planned in Scarborough Southwest

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.