Toronto address · Ward 1, Etobicoke North
19 Pylon Pl
The City of Toronto has 2 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Second suite (New)
Proposal for converting the existing finished basement to the additional dwelling unit with below grade entrance/ walk-up and adding a laundry for principal unit in the lower main floor level. The house is a back split.
Applied Apr 14, 2026 · issued Apr 15, 2026 · 1 home added · Permit 26 143368 BLD
- Cancelled
Small residential project · Second suite (New)
Proposal for converting the existing finished basement to the additional dwelling unit with below grade entrance/ walk-up and adding a laundry for principal unit in the lower main floor level. The house is a back split.
Applied Mar 27, 2026 · completed Apr 1, 2026 · 1 home added · Permit 26 135635 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
39 Norfield Cres · Minor variance
To construct a second storey addition above the existing dwelling and to maintain the existing one-storey east side addition. The altered dwelling will contain a total of four units.
180 m away · filed May 21, 2026 · Approved
8 Gem Pl · Minor variance
To construct a two-storey rear addition and a partial second storey addition.
200 m away · filed Apr 26, 2024 · Approved
90 Hadrian Dr · Minor variance
To construct a two-storey west side addition, a second storey addition above the existing dwelling and a new covered front porch.
230 m away · filed Apr 9, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.