Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 19, Beaches-East York

190 Pickering St

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Proposal to install back water valve.

    Applied Sep 5, 2018 · issued Sep 5, 2018 · completed Sep 6, 2018 · Permit 18 220195 DRN

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 88 Malvern Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a partial front one-storey addition (porch enclosure), and a rear three-storey addition with a third storey deck (to replace the existing rear two-storey portion of the dwelling and rear ground floor deck). This rear three-storey addition will be cantilevered on the north side of the dwelling. The existing rear one-storey detached ancillary building (garage containing a workshop) will be maintained and unaltered.

    210 m away · filed May 19, 2026 · Approved

  • 2345 Gerrard St E · Consent

    To obtain consent to sever the property into two residential lots and to maintain the existing easement/right-of-way.

    140 m away · filed Sep 19, 2025 · Approved

  • 103 Malvern Ave · Minor variance

    To construct a new rear two-storey detached ancillary building (containing two garden suites) with two porches on the south wall.

    180 m away · filed Jul 7, 2025 · Approved

  • 217 Pickering St · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear one-storey addition (including a basement level and walkout) with a wood deck and stairs.

    90 m away · filed Mar 11, 2025 · Approved

  • 55 Hannaford St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with a basement walkout, a ground floor deck, and a second storey rooftop terrace.

    170 m away · filed Nov 12, 2024 · Approved

  • 2333 Gerrard St E · Minor variance

    To construct a new three-storey detached dwelling (fourplex) with a front covered entrance, a rear ground floor terrace, and a rear staircase leading to balconies on all levels. Also, to construct a new one-storey ancillary building (two-car garage) with two parking pads, abutting Hannaford Street. There will be a total of four residential dwelling units on this lot.

    160 m away · filed Sep 11, 2024 · Approved

  • 121 Hannaford St · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing new rear stairs. Also, to construct a new ancillary building (detached garage) in the rear yard of the property, abutting the lane. The existing rear deck and detached garage will be demolished.

    90 m away · filed Feb 7, 2024 · Approved

  • 2374 Gerrard St E · Minor variance

    To alter the existing three-and-one-half-storey triplex dwelling by converting the basement into a dwelling unit (with a rear walkout). The main dwelling will have four residential units (one primary unit and three secondary suites). Also, to construct a two-storey ancillary building containing a laneway suite, in the rear yard. There will be a total of five residential dwelling units on this lot. There will be *three parking spaces, abutting the laneway.

    210 m away · filed Sep 27, 2022 · Approved

Everything planned in Beaches-East York

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.