Toronto address · Ward 12, Toronto-St. Paul's
1900 Yonge St
Davisville Station
The City of Toronto has 38 building permits since 2017 (29 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Fire and security upgrade · Emergency lighting
Upgrades to the fire alarm system of TTC McBrien Building.
Applied May 5, 2026 · issued May 29, 2026 · Permit 26 155228 FSU
- Revision issued
Addition or alteration · Interior alterations
Revision 01 - new pit safetygrating, davit arms, fall arrest anchors and updated detailsConstruction of new pit ladders at various locations at TTC's Davsiville Station
Applied Jul 11, 2025 · issued Aug 12, 2025 · Permit 23 225961 BLD (revision 01)
- Permit issued
Plumbing · Backflow prevention devices (Water only)
Installation of backflow preventers providing premise isolation for domestic and fire water services serving TTC's Davisville Subway Station.
Applied Jul 17, 2024 · issued Aug 19, 2024 · Permit 24 182085 PSA
- Permit issued
Addition or alteration · Interior alterations
Construction of new pit ladders at various locations at TTC's Davsiville Station
Applied Nov 14, 2023 · issued Dec 13, 2023 · Permit 23 225961 BLD
- Permit issued
Addition or alteration · Other
Existing diesel generator at McBrien Building will be replaced with a new diesel generator and will match the capacity of existing, and be rated at 350KW, 600VAC, 3 phase equipment.
Applied Jun 14, 2023 · issued Jul 24, 2023 · Permit 23 160530 BLD
- Permit issued
Heating and ventilation
HVAC - Existing diesel generator at McBrien Building will be replaced with a new diesel generator and will match the capacity of existing, and be rated at 350KW, 600VAC, 3 phase equipment.
Applied Jun 14, 2023 · issued Jul 24, 2023 · Permit 23 160530 HVA
- Revision issued
Addition or alteration · Re-Roofing/Re-Cladding
Revision 01 - Roof rehabilitation with fluid applied overlay membrane. Include some accessory work (new guardrails, exterior metal stairs).Proposal for full roof replacement with minor mechanical work (rooftop hvac units) at existing TTC subway station - W C McBrien Building
Applied Jun 10, 2022 · issued Jul 6, 2022 · Permit 21 127631 BLD (revision 01)
- Closed
Addition or alteration · Other
New wall mounted guardrails at roof level of Toronto Transit Commission's Davisville Substation
Applied Sep 13, 2021 · issued Sep 30, 2021 · completed Mar 26, 2024 · Permit 21 211825 BLD
- Permit issued
Heating and ventilation
HVAC - Proposal for full roof replacement with minor mechanical work (rooftop hvac units) at existing TTC subway station - W C McBrien Building
Applied Mar 16, 2021 · issued May 4, 2021 · Permit 21 127631 HVA
- Inspections under way
Addition or alteration · Re-Roofing/Re-Cladding
Proposal for full roof replacement with minor mechanical work (rooftop hvac units) at existing TTC subway station - W C McBrien Building
Applied Mar 16, 2021 · issued Apr 16, 2021 · Permit 21 127631 BLD
- Closed
Addition or alteration · Interior alterations
Construct interior alterations for TTC - McBrien Building to the existing 4th floor office/data centre space, including replacment of existing associated mechancial units
Applied Aug 30, 2019 · issued Nov 4, 2019 · completed Apr 4, 2022 · Permit 19 214113 BLD
- Closed
Heating and ventilation
HVAC - Construct interior alterations for TTC - McBrien Building to the existing 4th floor office/data centre space, including replacment of existing associated mechancial units
Applied Aug 30, 2019 · issued Nov 4, 2019 · completed Mar 21, 2022 · Permit 19 214113 HVA
Show 26 more permits
- Closed
Plumbing
Plumbing - Construct interior alterations for TTC - McBrien Building to the existing 4th floor office/data centre space, including replacment of existing associated mechancial units
Applied Aug 30, 2019 · issued Nov 4, 2019 · completed Mar 12, 2022 · Permit 19 214113 PLB
- Closed
Addition or alteration · Other
Remove asphalt pavement and mill down bus driveway structural slabs; construct concrete overlay and new waterproofing system; construct new approach slabs; concrete repair to slabs; replace tile floor finishing; replace damaged sidewalk; construct and remove upon completion of the construction the work platform; remove and reconstruct bridge window enclosure and bridge deck, recoat existing steel beams, concrete patch repair to slabs.
Applied Jan 7, 2019 · issued Feb 1, 2019 · completed Jun 24, 2020 · Permit 19 101843 BLD
- Inspections under way
Addition or alteration · Interior alterations
Proposed interior alterations to north portion of 7th floor.
Applied Oct 5, 2018 · issued Oct 23, 2018 · Permit 18 238206 BLD
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations for removal of existing fare gate and installation of new Presto fare gates. TTC Davisville station.
Applied Aug 1, 2017 · issued Aug 15, 2017 · completed Oct 16, 2019 · Permit 17 209568 BLD
- Permit issued
Plumbing
Plumbing - Proposal for interior alterations to existing office building. Scope of work includes sump pump replacement and new installation of emergency lighting - Toronto Transit Commission
Applied Mar 29, 2016 · issued Apr 25, 2016 · Permit 16 132924 PLB
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations to existing office building. Scope of work includes sump pump replacement and new installation of emergency lighting - Toronto Transit Commission
Applied Mar 29, 2016 · issued Apr 12, 2016 · Permit 16 132924 BLD
- Closed
Addition or alteration · Interior alterations
Proposal to construct an interior partition and add air conditioning units in the existing office building.
Applied May 27, 2014 · issued Aug 7, 2014 · completed Feb 27, 2018 · Permit 14 162400 BLD
- Closed
Heating and ventilation
HVAC - Proposal to construct an interior partition and add air conditioning units in the existing office building.
Applied May 27, 2014 · issued Aug 7, 2014 · completed Feb 13, 2018 · Permit 14 162400 HVA
- Permit issued
Heating and ventilation · Alter: Boiler/Furnace/AC replacement
Proposal to install 2 new split A/C units in existing computer room on the 4th floor.
Applied Oct 15, 2012 · issued Nov 1, 2012 · Permit 12 262364 MSA
- Inspections under way
Heating and ventilation
HVAC - Interior alterations to portions of BSMT storage areas, remove internal stair with concrete infill. TTC Headquarters Building. Single Tenant Building
Applied Oct 24, 2007 · issued Nov 16, 2007 · Permit 07 272933 HVA
- Inspections under way
Addition or alteration · Interior alterations
Interior alterations to portions of BSMT storage areas, remove internal stair with concrete infill. TTC Headquarters Building. Single Tenant Building
Applied Oct 24, 2007 · issued Nov 7, 2007 · Permit 07 272933 BLD
- Inspections under way
Fire and security upgrade · Electromagnetic locks
1 maglock on 2nd floor
Applied Jul 18, 2007 · issued Aug 8, 2007 · Permit 07 244294 FSU
- Inspections under way
Heating and ventilation
HVAC - Interior alterations to portions of 4th floor Offices. Singel tenant Floor
Applied May 11, 2007 · issued Jul 4, 2007 · Permit 07 210351 HVA
- Inspections under way
Addition or alteration · Interior alterations
Interior alterations to portions of 4th floor Offices. Singel tenant Floor
Applied May 11, 2007 · issued Jul 4, 2007 · Permit 07 210351 BLD
- Permit issued
Heating and ventilation
HVAC - Interior alterations to existing office space on the 3rd floor. (TTC Head Office)
Applied Aug 11, 2006 · issued Sep 8, 2006 · Permit 06 165916 HVA
- Inspections under way
Addition or alteration · Interior alterations
Interior alterations to existing office space on the 3rd floor. (TTC Head Office)
Applied Aug 11, 2006 · issued Sep 5, 2006 · Permit 06 165916 BLD
- Inspections under way
Addition or alteration · Multiple projects
Ugrade the electrical capacity to the existing building. A 1500kVA unit substation to be installed above ground on existing parking lot with a new 8'-0" high brick wall enclosure. Swith gear to be installed in an expanded electrical room on mezzanine level of carhouse
Applied Aug 18, 2005 · issued Sep 19, 2005 · Permit 05 172209 BLD
- Permit issued
Heating and ventilation
HVAC - Ugrade the electrical capacity to the existing building. A 1500kVA unit substation to be installed above ground on existing parking lot with a new 8'-0" high brick wall enclosure. Swith gear to be installed in an expanded electrical room on mezzanine level of carhouse - Multiple Projects
Applied Aug 18, 2005 · issued Sep 22, 2005 · Permit 05 172209 HVA
- Inspections under way
Addition or alteration · Interior alterations
To demolish existing platforms and construct new concrete platforms.
Applied Mar 18, 2005 · issued Mar 31, 2005 · Permit 05 116461 BLD
- Inspections under way
Addition or alteration · Interior alterations
make interior alterations to portion of the ground floor - transit shop
Applied Jul 23, 2002 · issued Jul 26, 2002 · Permit 02 156545 BLD
- Under review
Plumbing
Plumbing - make interior alterations to portion of the ground floor - transit shop - Interior Alterations
Applied Jul 23, 2002 · Permit 02 156545 PLB
- Permit issued
Heating and ventilation
alter hvac system on portion of ground floor - transit shop
Applied Jul 23, 2002 · issued Aug 2, 2002 · Permit 02 156545 HVA
- Inspections under way
Heating and ventilation · Install/Alter HVAC - only
Alter ductwork at track level to existing h.v.a.c. system. cost incl. 99 -117593
Applied Mar 9, 2000 · issued Mar 21, 2000 · Permit 00 133911 HVA
- Inspections under way
Non-residential building permit · Addition/Alteration to existing building
CARD PRINTED make interior alterations and erect 1 storey addition at north east corner
Applied Dec 21, 1999 · issued Mar 8, 2000 · Permit 99 117593 CMB
- Permit issued
Heating and ventilation · Unknown
Install h.v.a.c. Unit on roof and renovate air handling unit in basement jnb
Applied Sep 3, 1998 · issued Oct 27, 1998 · Permit 98 021120 HVA
- Closed (dormant)
Plumbing · Unknown
Install plumbing fixtures on ground floor restaurant: 2 w.c., 4 w.b., 1 3-compt. K.s., 1 dishwasher, 1 h.w.t., 1 janitor sink refer to application number: 407829 cost included in 407829 edc
Applied Jan 9, 1998 · issued Jan 28, 1998 · completed Sep 18, 2026 · Permit 98 012249 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
48 storeys · 939 homes · Mixed use
70 m away · Site plan · Under review · filed Nov 5, 2021
- Under review
40 storeys · 414 homes · Mixed use
90 m away · Site plan · Under review · filed Apr 19, 2022
- Under review
1913-1951 Yonge Street, 17-21 Millwood Road and 22 Davisville Avenue
45 storeys · 818 homes · Residential
110 m away · Site plan · Under review · filed Aug 1, 2023
- Under review
40 storeys · 477 homes · Residential
150 m away · Site plan · Under review · filed Nov 8, 2021
- Under review
60 Balliol Street and 33 Davisville Avenue
33 storeys · 526 homes · Residential
150 m away · Site plan · Under review · filed Jun 14, 2022
- Under review
45 storeys · 379 homes · Mixed use
180 m away · Rezoning · Under review · filed Feb 27, 2026
Neighbours’ Committee of Adjustment files within 250 m
30 Merton St · Consent
To obtain consent to sever the property into three stratified lots (commercial parking lands, retail lands, and residential lands) and to create various easements/rights-of-ways for the approved 37-storey mixed-use building with a three level below grade parking garage (currently under construction).
190 m away · filed Jul 23, 2026 · Hearing scheduled
1951 Yonge St · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-Law 907-2024(OLT)) for mixed-use buildings, by reducing the minimum number of parking spaces required.
160 m away · filed Mar 17, 2025 · Approved
19 Colin Ave · Minor variance
To construct a new three-storey detached dwelling with a front integral garage, a covered front porch and stairs, a rear ground level patio, and a rear third floor covered balcony. The existing rear inground swimming pool, hot tub, and cabana will be maintained and unaltered.
240 m away · filed Dec 10, 2024 · Approved
9 Colin Ave · Minor variance
To permit the new two-storey detached dwelling with a covered front porch and a covered rear deck.
210 m away · filed Oct 29, 2024 · Approved
33 Davisville Ave · Consent
To obtain consent to sever the property into two lots, to maintain existing easements/rights-of-way as well as to create new easements/rights-of-way.
170 m away · filed May 2, 2024 · Approved
9 Colin Ave · Minor variance
To construct a new two-storey detached dwelling with a covered front porch and a covered rear deck.
210 m away · filed Jun 15, 2023 · Approved
1913 Yonge St · Minor variance
To legalize and to maintain the shed that has been constructed between the two-storey building and the detached garage, without the benefit of a building permit.
100 m away · filed Feb 24, 2022 · Approved
45 Balliol St · Consent
To obtain consent for a strata severance and to create easements/rights-of-way.
160 m away · filed May 9, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.