Toronto address · Ward 9, Davenport
193 St Clarens Ave
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Party wall admin permits
Admin party wall permit in conjunction with 195 St Clarens Ave. (19 155463)
Applied Jun 20, 2019 · issued Jun 24, 2019 · completed Feb 16, 2024 · Permit 19 175320 BLD
- Closed
Small residential project · Party wall admin permits
Party Wall Permit related to 18-106688
Applied Jul 3, 2018 · issued Jul 4, 2018 · completed Aug 18, 2025 · Permit 18 188206 BLD
- Closed
Small residential project · Unknown
Enlarge window openinf at rear of 2nd floor. Fee $ 80.00
Applied Jun 17, 1999 · issued Jun 17, 1999 · completed Feb 17, 2026 · Permit 99 017893 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Approved
9 storeys · Residential
110 m away · Rezoning · Approved · filed Mar 23, 2026
Neighbours’ Committee of Adjustment files within 250 m
367 Brock Ave · Minor variance
200 m away · filed Jul 13, 2026 · Postponed
3 Lumbervale Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear second storey addition (above the existing first floor addition), and a rear basement walkout.
170 m away · filed May 1, 2026 · Approved
148 Margueretta St · Minor variance
To alter the existing rear one-storey detached ancillary building (one-car garage abutting the laneway) by constructing a complete second storey addition (to contain one laneway suite) with a side (east) dormer, and a covered second storey balcony at the northwest corner. The second storey of this ancillary building will be cantilevered on the east side. There will be a total of four residential dwelling units on this lot (three units within the main dwelling, and one unit within the ancillary building).
220 m away · filed Apr 7, 2026 · Approved
155 Margueretta St · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a new one-storey ancillary building (detached garage) in the rear yard. This ancillary building will not be used for habitable space.
250 m away · filed Aug 25, 2025 · Approved
137 Margueretta St · Minor variance
To alter the existing two- storey detached dwelling by constructing a rear second storey addition, a complete third storey addition with a rear balcony, a rear ground level porch, and a basement walkout. There will be a total of two residential dwelling units on this lot (one unit within the basement level, and one unit to occupy the first, second, and third levels).
210 m away · filed Aug 15, 2025 · Approved
163 St Clarens Ave · Minor variance
To construct a new three-storey detached dwelling (fourplex) with a front ground floor landing with stairs, a side (north) ground floor walkout, two rear ground floor landings with stairs and two third floor side (north) terraces (Unit A and Unit C). Also, to construct a new two-storey laneway suite in the rear yard with a front (west) second floor terrace. There will be a total of five dwelling units on the lot (four units within the main dwelling and one unit within the laneway suite). The existing rear detached garage will be demolished.
100 m away · filed May 13, 2025 · Approved
139 Margueretta St · Minor variance
To construct a one-storey ancillary building (detached garage) in the rear yard, abutting the laneway. The existing garage will be demolished.
210 m away · filed Sep 6, 2024 · Approved
88 Margueretta St · Minor variance
To alter the existing two-storey townhouse dwelling by constructing a front basement walkout entry with stairs.
80 m away · filed Sep 6, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.