Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

1993 Yonge St

The City of Toronto has 6 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    Rev 2 - Proposed revision to ground floor plan. Infill front addition and new outswing entrance door.Remove second floor dwelling unit and convert space to expansion of main floor restaurant, creating an Assembly occupancy.Proposed 65 total seats ( 25 first floor and 40 second floor).

    Applied Mar 27, 2019 · issued May 15, 2019 · completed Oct 29, 2021 · Permit 16 227847 BLD (revision 02)

    Closed
  • Heating and ventilation

    HVAC - Remove second floor dwelling unit and convert space to expansion of main floor restaurant, creating an Assembly occupancy.Proposed 65 total seats ( 25 first floor and 40 second floor).

    Applied Feb 15, 2019 · issued Mar 12, 2019 · completed Nov 3, 2021 · Permit 16 227847 HVA

    Closed
  • Plumbing

    Plumbing - Remove second floor dwelling unit and convert space to expansion of main floor restaurant, creating an Assembly occupancy.Proposed 65 total seats ( 25 first floor and 40 second floor).

    Applied Feb 15, 2019 · issued Mar 12, 2019 · completed Oct 26, 2021 · Permit 16 227847 PLB

    Closed
  • Addition or alteration · Interior alterations

    Rev 1 - Proposed revision to second floor plan.Remove second floor dwelling unit and convert space to expansion of main floor restaurant, creating an Assembly occupancy.Proposed 65 total seats ( 25 first floor and 40 second floor).

    Applied Feb 12, 2019 · issued Mar 13, 2019 · completed Oct 29, 2021 · Permit 16 227847 BLD (revision 01)

    Closed
  • Addition or alteration · Interior alterations

    Remove second floor dwelling unit and convert space to expansion of main floor restaurant, creating an Assembly occupancy.Proposed 65 total seats ( 25 first floor and 40 second floor).

    Applied Sep 23, 2016 · issued Feb 1, 2017 · completed Oct 29, 2021 · Permit 16 227847 BLD

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Install a 1" backflow prevention device

    Applied Feb 11, 2016 · issued Feb 19, 2016 · completed Jan 21, 2019 · Permit 16 115743 PSA

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 26 Carey Rd · Minor variance

    To construct a new undersized front yard parking pad, abutting Carey Road. The existing three-storey detached dwelling on the lot will be maintained and unaltered.

    250 m away · filed Dec 4, 2025 · Refused

  • 1951 Yonge St · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-Law 907-2024(OLT)) for mixed-use buildings, by reducing the minimum number of parking spaces required.

    160 m away · filed Mar 17, 2025 · Approved

  • 2100 Yonge St · Consent

    To obtain consent to a strata severance and to create various easements/rights-of-way.

    240 m away · filed Feb 14, 2025 · Approved

  • 11 Tullis Dr · Minor variance

    To construct a new three-storey detached dwelling with a front covered porch, a rear basement walkout, a rear ground floor deck, a rear second storey balcony with an exterior staircase, and a rear third storey rooftop terrace. This dwelling will have three residential units (triplex). Also, to construct a one-storey ancillary building (detached garage) in the rear yard.

    220 m away · filed Feb 8, 2024 · Approved

  • 2100 Yonge St · Minor variance

    To permit a lower percentage of units with three bedrooms or more within a new 12-storey mixed-use building (that will contain 7 rental replacement suites and a total of 76 residential dwelling units).

    240 m away · filed Apr 26, 2022 · Approved

  • 11 Glebe Rd E · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front integral garage and covered porch, a rear two-storey addition with a ground floor deck, and a partial third storey addition with a rear balcony.

    70 m away · filed Mar 8, 2022 · Approved

  • 1913 Yonge St · Minor variance

    To legalize and to maintain the shed that has been constructed between the two-storey building and the detached garage, without the benefit of a building permit.

    230 m away · filed Feb 24, 2022 · Approved

  • 5 Belsize Dr · Minor variance

    To construct a partial third storey addition and third storey rear deck.

    60 m away · filed Jul 6, 2021 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.