Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

2 Bridgman Ave

The City of Toronto has 1 building permit since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Construct two storey addition attached to the rear of the existing dwelling. Also enlarge the attic and roof over the proposed additions and existing dwelling. Convert the existing single unit dwelling into a two unit dwelling. See OMB decision dated July 18, 2002

    Applied Aug 14, 2002 · issued Sep 27, 2002 · completed Sep 26, 2019 · 1 home added · Permit 02 163709 BLD

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To legalize and to maintain as well as construct new alterations to the three-storey detached dwelling. The additional secondary suite (for a total of two), front second and full third storey additions, the front portion of the rooftop mechanical and perimeter screen fence which were constructed without a building permit will be legalized and maintained. The rear portion of the rooftop mechanical and perimeter screen fence, a rear exterior stair/platform structure serving the ground floor to roof level and two rear surface parking spaces will be constructed.

    Decision: Refused (hearing Aug 28, 2019)

    Filed Nov 12, 2018 · File A1056/18TEY

    Closed

What’s planned nearby

Development sites within 500 m

  • 374-390 Dupont Street

    16 storeys · 257 homes · Mixed use

    140 m away · Site plan · Under review · filed Oct 31, 2021

    Under review
  • 500 Macpherson Avenue

    8 storeys · 135 homes · Residential

    170 m away · Site plan · Under review · filed Apr 25, 2022

    Under review
  • 555 Davenport Road

    8 storeys · 134 homes · Residential

    210 m away · Site plan · Under review · filed Apr 25, 2022

    Under review
  • 574 Davenport Road

    Not stated in the file

    210 m away · Condominium · Approved · filed Oct 4, 2022

    Approved
  • 316-320 Dupont Street

    13 storeys · 115 homes · Residential

    230 m away · Condominium · Approved · filed Oct 28, 2024

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 574 Davenport Rd · Minor variance

    To construct a new three-storey apartment building with front and rear balconies (located on the second and third storeys), front and rear basement walkouts, front and rear porches, exterior stairs (at the northwest, northeast, and southeast corners of the building), and a raised planter with concrete wall at the southwest corner. There will be a total of 12 residential dwelling units on this corner lot.

    220 m away · filed Jun 12, 2026 · Approved

  • 523 Brunswick Ave · Minor variance

    To convert the existing two-and-one-half-storey semi-detached dwelling into a detached dwelling. This dwelling will be altered with new insulation and cladding to detach it from the attached dwelling to the south (municipally known as 521 Brunswick Avenue). The existing front yard parking pad will be maintained and unaltered.

    240 m away · filed Mar 31, 2025 · Approved

  • 521 Brunswick Ave · Consent

    To obtain consent to sever a portion of land for the purpose of a lot addition.

    240 m away · filed Mar 25, 2025 · Refused

  • 555 Davenport Rd · Minor variance

    To alter the development standards of the new 10-storey mixed-use building (as approved under Site Specific Zoning By-law 739-2023) by increasing: the height of 30.5 m to 37.0 m and number of storeys (from 8-storeys to 10-storeys, and from 7-storeys to 9-storeys along Davenport Road), the gross floor area for residential and non-residential uses, and the encroachment of balconies, to reduce setbacks and separation distances, and to permit a retail use. There will be a total of 168 residential dwelling units, instead of 143 units.

    230 m away · filed Mar 6, 2025 · Approved

  • 521 Brunswick Ave · Minor variance

    To construct a new three-storey detached dwelling with a front covered porch with stairs, rear basement walkout with patio, rear ground floor deck with stairs, and a rear third storey balcony. Also, the existing front yard parking pad will be maintained and unaltered. The existing two-and-one-half-storey semi-detached dwelling will be demolished.

    240 m away · filed Jan 8, 2025 · Approved

  • 362 Dupont St · Minor variance

    To alter the existing three-storey semi-detached dwelling by converting the commercial office spaces into two residential dwelling units.

    180 m away · filed Nov 25, 2024 · Approved

  • 500 Macpherson Ave · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 783-2023) for a 8-storey mixed-use apartment building by increasing: building setbacks, building height (8-storeys (30.5 m) to 11-storeys (39.9 m), including mechanical penthouse), and gross floor area (including residential and introducing non-residential use(s)) and permitting a retail use. There will be a total of 206 residential dwelling units (instead of 152 residential dwelling units) and 115 car parking spaces on this site.

    190 m away · filed Nov 19, 2024 · Approved

  • 343 Albany Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a third storey addition with a rear third floor deck on the roof of the second storey below, and a two-storey rear addition (at the southeast portion of the dwelling).

    180 m away · filed Jun 1, 2024 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.