Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 4, Parkdale-High Park

2 Geoffrey St

The City of Toronto has 1 building permit since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Construct 2 storey rear addition, 2nd floor deck at rear and 3rd storey deck at rear.

    Applied Jun 1, 2001 · issued Jun 14, 2001 · completed Jun 8, 2026 · Permit 01 143349 CMB

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 6 Howard Park Avenue

    11 storeys · 130 homes · Mixed use

    460 m away · Condominium · Under review · filed Nov 8, 2021

    Under review
  • 1280 College Street

    9 storeys · Residential

    500 m away · Rezoning · Approved · filed Jun 16, 2026

    Approved
  • 1280-1286 College Street

    9 storeys · Residential

    500 m away · Rezoning · Approved · filed Mar 23, 2026

    Approved

Neighbours’ Committee of Adjustment files within 250 m

  • 46 Fermanagh Ave · Minor variance

    220 m away · filed Sep 24, 2026 · Accepted

  • 44 Fermanagh Ave · Minor variance

    220 m away · filed Sep 24, 2026 · Accepted

  • 40 Wabash Ave · Minor variance

    To construct a new four-storey detached building (Wabash Community Recreation Centre) with a west side attached outdoor activity space, a canopy over the west side main entrance, and solar roof panels on rear third floor and roof level. There will be a total of 10 surface parking spaces (including three accessible parking spaces), on the west side main entrance, accessed from Wabash Avenue. A related Site Plan Control application (File No. 24 180616 STE 04 SA) is currently under review and consideration.

    240 m away · filed Jul 8, 2026 · Hearing scheduled

  • 43 Grenadier Rd · Minor variance

    To construct a new one-storey detached ancillary building (a one-car garage with storage space) in the rear yard, abutting the laneway.

    120 m away · filed Jan 5, 2026 · Approved

  • 23 Westminster Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a partial front second storey addition, a rear one-storey addition, a partial rear second storey addition, a rear second storey rooftop balcony (above the rear one-storey addition), a rear third storey rooftop egress balcony (above the rear second-storey addition), a front porch extension, a rear ground floor deck, and a rear basement walkout.

    130 m away · filed Jul 15, 2025 · Approved

  • 310 Sorauren Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition within a basement level.The existing rear deck with stairs will be demolished.

    30 m away · filed Apr 7, 2025 · Approved

  • 73 Westminster Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a front third storey (attic) addition.

    240 m away · filed Jan 27, 2025 · Approved

  • 48 Fermanagh Ave · Minor variance

    To alter the existing two-storey townhouse dwelling by constructing a rear two-storey addition (partially cantilevered) with a covered ground floor deck and stairs.

    220 m away · filed Jan 24, 2025 · Approved

Everything planned in Parkdale-High Park

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.