Toronto address · Ward 12, Toronto-St. Paul's
2 Humewood Gdns
The City of Toronto has 2 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Drains and site services
Drain - Underpinning of existing basement for single family dwelling.
Applied May 22, 2009 · issued May 22, 2009 · Permit 09 113404 DRN
- Inspections under way
Small residential project · Underpinning
Underpinning of existing basement for single family dwelling.
Applied Mar 2, 2009 · issued Mar 2, 2009 · Permit 09 113404 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
17 storeys · 110 homes · Mixed use
470 m away · Site plan · Under review · filed Jun 24, 2026
Neighbours’ Committee of Adjustment files within 250 m
55 Pinewood Ave · Minor variance
To alter the existing one-and-one-half-storey detached dwelling by constructing a front second storey addition, a rear three-storey addition with a rear ground floor deck and stairs, third storey side (north and south) dormers, and a new front yard driveway. The existing rear one-storey ancillary building (garage) will be demolished.
210 m away · filed Aug 5, 2026 · Hearing scheduled
6 Wellwood Ave · Minor variance
To alter the existing rear one-storey detached ancillary building (one-car garage), by constructing a complete second storey addition. This ancillary building will contain a one-car garage on the ground level, and one garden suite (occupying a portion on the ground level and the entire second level). There will be a total of two residential dwelling units on this lot (one unit within the main dwelling, and one unit within the ancillary building).
170 m away · filed Sep 10, 2025 · Approved
137 Maplewood Ave · Minor variance
To permit the existing three-storey detached dwelling with a rear ground floor deck, a rear second floor balcony, and a rear one-storey ancillary building (detached garage), which were constructed beyond the limits of the authorized building permit.
210 m away · filed Mar 6, 2025 · Approved
60 Pinewood Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (including a basement level).
190 m away · filed Feb 5, 2025 · Approved
162 Arlington Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a front two-storey addition (a one-storey portion will be partially cantilevered) with a covered front porch and an integral garage, a rear two-storey addition (a one-storey portion will be partially cantilevered at the rear ground floor and the side (south) second floor) with a rear second floor deck, a rear ground floor deck with stairs, and a rear basement walkout. There will be a total of two residential dwelling units (duplex) on this lot.
200 m away · filed Jun 10, 2024 · Approved
336 Rushton Rd · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition, and a new rear ground floor covered deck. Also, to construct a new ancillary structure (detached shed) in the rear yard. In addition, there will be a ground mounted air conditioner in the front yard, as well as a front yard parking pad. The existing detached shed, and rear ground level deck, will be demolished.
180 m away · filed Mar 7, 2024 · Approved
137 Maplewood Ave · Minor variance
To permit the one-storey ancillary building (detached garage) at the rear of the property.
210 m away · filed May 18, 2023 · Approved
12 Pinewood Ave · Minor variance
To alter the existing three-storey detached dwelling by constructing a rear third storey addition with a walkout deck, a rear second storey addition, a rear ground level walkout deck, and a front third storey balcony.
220 m away · filed Nov 18, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.