Toronto address · Ward 20, Scarborough Southwest
2 Mack Ave
The City of Toronto has 6 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Demolition of existing dwelling and construction of a new 2 storey detached single family dwelling with integral garage and finished basement
Applied Aug 10, 2017 · issued Mar 2, 2018 · completed Feb 7, 2019 · Permit 17 148532 HVA
- Closed
Plumbing
Plumbing - Construction of a new 2 storey detached single family dwelling with integral garage and finished basement
Applied Apr 24, 2017 · issued Jun 6, 2017 · completed Feb 7, 2019 · Permit 17 148532 PLB
- Closed
New house · New building
Demolition of existing dwelling and construction of a new 2 storey detached single family dwelling with integral garage and finished basement
Applied Apr 24, 2017 · issued Jun 6, 2017 · completed Apr 30, 2020 · 1 home added · Permit 17 148532 BLD
- Closed
Demolition
Demolition of existing dwelling and construction of a new 2 storey detached single family dwelling with integral garage and finished basement
Applied Apr 24, 2017 · issued Jun 6, 2017 · completed Aug 10, 2017 · 1 home removed · Permit 17 148534 DEM
- Closed
Drains and site services
Drain - Construction of a new 2 storey detached single family dwelling with integral garage and finished basement
Applied Apr 24, 2017 · issued Jun 6, 2017 · completed Feb 27, 2019 · Permit 17 148532 DRN
- Cancelled
Small residential project · Other
Reconstruct portion of existing foundation wall (approx 8 lm) south west corner
Applied May 5, 2015 · issued May 8, 2015 · completed Aug 27, 2019 · Permit 15 152023 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
The applicant is seeking relief from the provisions of the Zoning By-law to construct a new two storey single family dwelling. The existing dwelling will be demolished.
Decision: Approved (hearing Jan 19, 2017)
Filed Nov 3, 2016 · File A0328/16SC
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
594 Warden Ave · Minor variance
Proposed front and rear addition including interior alterations to existing dwelling. Demolition of front sunroom and rear addition. New house by way of renovation.
150 m away · filed Sep 2, 2026 · Accepted
10 Mack Ave · Minor variance
To construct a new two storey dwelling.
30 m away · filed Jan 6, 2021 · Approved
18 Mack Ave · Minor variance
To construct a new two-storey detached dwelling.
70 m away · filed Mar 19, 2018 · Approved
195 Danforth Rd · Minor variance
The applicant is seeking relief from the provisions of the Zoning By-law to construct a new two storey single family residential dwelling.
210 m away · filed Sep 22, 2017 · Approved
195 Danforth Rd · Minor variance
The applicant is seeking relief from the provisions of the Zoning By-law to construct a new two storey single family residential dwelling.
210 m away · filed Sep 22, 2017 · Approved
195 Danforth Rd · Consent
This application is for consent to sever the land into two lots, as shown on the attached Site Plan. Lot to be created Part 1 would have a frontage of 7.47 metres and a lot area of 294.7 square metres. Lot to be created Part 2 would have a frontage of 7.47 metres and a lot area of 355.2 square metres. In order to facilitate the proposed development, relief from the provision of the Zoning By-law was requested, as outlined in A0351/17SC and A0352/17SC.
210 m away · filed Sep 22, 2017 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.