Toronto address · Ward 9, Davenport
2 Parkman Ave
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Garage
Proposal to construct rear detached garage. Refer to PPR and CofA files. Existing single family dwelling.
Applied Mar 13, 2012 · issued Mar 16, 2012 · completed Feb 23, 2026 · Permit 12 135981 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under appeal
321-355 Symington Avenue and 350 Campbell Avenue
36 storeys · 873 homes · Residential
200 m away · Rezoning · Under appeal · filed Nov 24, 2022
- Approved
26 storeys · 314 homes · Residential
230 m away · Site plan · Approved · filed Apr 26, 2022
- Under appeal
- Under review
1650-1664 Dupont Street and 3 Osler Street
6 storeys · 28 homes · Mixed use
330 m away · Site plan · Under review · filed Aug 16, 2021
- Under review
224-258 Wallace Avenue and 80-90 Ward Street
Mixed use
410 m away · Rezoning · Under review · filed May 14, 2026
Neighbours’ Committee of Adjustment files within 250 m
267 Symington Ave · Minor variance
To construct a new two-storey semi-detached ancillary building (containing one laneway suite), in the rear yard, abutting the laneway. There will be two dwelling units on this lot.
150 m away · filed May 14, 2024 · Approved
20 Hugo Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a partial ground floor side (east) addition, and a second storey rear addition (cantilevered over the existing one-storey portion of the building). The existing one-storey ancillary building (detached garage, in the rear yard, abutting the laneway) will be maintained and unaltered.
210 m away · filed Apr 16, 2024 · Approved
265 Symington Ave · Minor variance
To construct a new two-storey ancillary building (containing one laneway suite), in the rear yard, abutting the laneway. There will be two dwelling units on this lot.
150 m away · filed Apr 6, 2024 · Approved
9 Hugo Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a front one-storey addition (enclosing the front covered porch into habitable space), and a rear second storey addition.
180 m away · filed Feb 13, 2024 · Approved
316 Campbell Ave · Minor variance
To alter the development standards for the 26-storey mixed-use building (as approved under Site Specific Zoning By-Law 1074-2022) by increasing the project average rent across the 21 Affordable Housing Units.
240 m away · filed Jan 12, 2024 · Approved
38 Hugo Ave · Minor variance
To construct a second storey on the existing rear ancillary building (detached garage) and convert it into a two-storey laneway suite. The existing parking spaces within the ground floor of the garage will be removed. The existing two-storey detached main dwelling on the lot will remain unaltered.
220 m away · filed Nov 15, 2023 · Withdrawn
315 Perth Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition.
200 m away · filed Apr 11, 2022 · Approved
317 Perth Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition.
200 m away · filed Apr 11, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.