The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed (dormant)
Residential building permit · New building
Detached carport in rear yard
Applied Aug 23, 2000 · issued Aug 24, 2000 · completed Jun 8, 2026 · Permit 00 330750 CMB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
12 Crewe Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear one-storey addition with an at-grade patio and pergola. Also, to construct a partial rear second storey addition, which will be cantilevered on the east side of the dwelling.
80 m away · filed Apr 15, 2026 · Approved
190 Westlake Ave · Minor variance
To construct a new two-storey detached dwelling (houseplex), with a cantilevered second storey at the rear portion of the building, a covered front porch with stairs, a front box bay window, a side (north) ground floor canopy, and a rear ground floor covered terrace with stairs. Also, to alter the existing rear one-storey detached ancillary building (one-car garage), abutting Orley Avenue, by constructing an addition at the north and east sides of the building. There will be two residential dwelling units on this lot (both units within the main dwelling).
160 m away · filed Feb 19, 2026 · Approved
213 Gledhill Ave · Minor variance
To construct a new three-storey detached dwelling (houseplex) with front and rear basement walkouts, a covered front porch with stairs, a rear partially covered ground floor deck, front and rear second and third storey balconies, and a rear yard parking pad. There will be a total of six residential dwelling units on this lot.
160 m away · filed Feb 9, 2026 · Approved
160 Westlake Ave · Minor variance
To permit the existing rear ground floor deck, which was constructed without an authorized building permit.
250 m away · filed Jan 24, 2025 · Approved
169 Gledhill Ave · Minor variance
To alter the existing two-storey detached dwelling by reconstructing the existing enclosed front enclosure that was constructed without an authorized building permit, and to construct a front second storey addition (above the enclosed porch), and a front porch with stairs and a canopy. Also, to permit the rear ground floor deck with stairs that was constructed without an authorized building permit (the rear deck is obstructing access to the parking space in the rear yard).
150 m away · filed Jan 2, 2025 · Approved
33 Wallington Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear one-storey addition with a rear second storey rooftop deck above, and a rear ground floor deck.
210 m away · filed Jul 22, 2024 · Approved
191 Gledhill Ave · Minor variance
To construct a new three-storey detached dwelling (fourplex) by constructing a front porch, a front and rear basement walkout, a rear first storey covered deck, a rear second floor balcony, and front and rear third floor decks (on the roof of the second storey below). Also, to construct a rear two-storey detached ancillary building (garden suite). There will be a total of five dwelling units on this lot.
130 m away · filed Oct 27, 2023 · Approved
34 Crewe Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a front one-storey addition (enclosing the porch) into habitable space.
210 m away · filed Oct 24, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.