Toronto address · Ward 9, Davenport
2 Westmount Ave
The City of Toronto has 11 building permits since 2017 and 2 Committee of Adjustment files on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal to convert the existing detached garage to a two-storey garden suite by constructing a second storey addition.
Applied Jan 28, 2025 · issued Feb 26, 2025 · completed May 8, 2025 · Permit 24 228250 HVA
- Closed
Plumbing
Plumbing - Proposal to convert the existing detached garage to a two-storey garden suite by constructing a second storey addition.
Applied Oct 22, 2024 · issued Nov 26, 2024 · completed May 8, 2025 · Permit 24 228250 PLB
- Closed
Drains and site services
Drain - Proposal to convert the existing detached garage to a two-storey garden suite by constructing a second storey addition.
Applied Oct 22, 2024 · issued Nov 26, 2024 · completed May 13, 2025 · Permit 24 228250 DRN
- Closed
Small residential project · New laneway / rear yard suite
Proposal to convert the existing detached garage to a two-storey garden suite by constructing a second storey addition.
Applied Oct 18, 2024 · issued Nov 26, 2024 · completed May 13, 2025 · 1 home added · Permit 24 228250 BLD
- Closed
Plumbing
Plumbing - Proposed interior alterations to basement to add a new dwelling unit (third unit) to existing two storey two-unit detached dwelling.
Applied Jun 18, 2019 · issued Jul 3, 2019 · completed Oct 9, 2019 · Permit 19 155321 PLB
- Closed
Small residential project · Interior alterations
Proposed interior alterations to basement to add a new dwelling unit (third unit) to existing two storey two-unit detached dwelling.
Applied May 16, 2019 · issued Jun 3, 2019 · completed Nov 4, 2019 · 1 home added · Permit 19 155321 BLD
- Closed
Small residential project · Multiple projects
REV #1-STRUCTURAL CHANGESProposal for interior alterations to add 1 secondary suites and underpinning
Applied Dec 21, 2018 · issued Dec 31, 2018 · completed May 8, 2019 · Permit 18 181391 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations to add 1 secondary suites and underpinning
Applied Sep 27, 2018 · issued Nov 19, 2018 · completed May 6, 2019 · Permit 18 181391 HVA
- Closed
Drains and site services
Drain - Proposal for interior alterations to add 1 secondary suites and underpinning
Applied Aug 15, 2018 · issued Aug 16, 2018 · completed May 6, 2019 · Permit 18 181391 DRN
- Closed
Plumbing
Plumbing - Proposal for interior alterations to add 1 secondary suites and underpinning
Applied Aug 15, 2018 · issued Aug 16, 2018 · completed May 6, 2019 · Permit 18 181391 PLB
- Closed
Small residential project · Multiple projects
Proposal for interior alterations to add 1 secondary suites and underpinning
Applied Jun 20, 2018 · issued Aug 10, 2018 · completed May 8, 2019 · 2 homes added · Permit 18 181391 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To convert the existing detached garage, accessed from Regal Road, into a two-storey garden suite by constructing a second storey addition (cantilevered on the east side), located at the rear of the existing two-and-one-half-storey, three-unit, detached main dwelling (triplex). Also, to retain two existing parking spaces (one of which is undersized) on the lot, abutting Regal Road. There will be a total of four residential dwelling units on the lot.
Decision: Approved (hearing Aug 28, 2024)
Filed May 31, 2024 · File A0524/24TEY
- Closed
Minor variance · R addition
To alter the existing 2½-storey detached dwelling with a rear one-storey detached garage by creating a third dwelling unit in the basement, a fourth dwelling unit in the garage, and by constructing a second storey addition on top of the garage.
Decision: Refused (hearing Jul 11, 2019)
Filed Feb 16, 2019 · File A0175/19TEY
What’s planned nearby
Development sites within 500 m
- Submitted
9 storeys · 60 homes · Residential
350 m away · Site plan · Submitted · filed Jul 29, 2026
Neighbours’ Committee of Adjustment files within 250 m
1525 Dufferin St · Minor variance
50 m away · filed May 11, 2026 · Postponed
113 Bristol Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by extending the one-storey rear addition into a complete two-storey rear addition with a second storey balcony.
230 m away · filed Oct 20, 2022 · Approved
1502 Dufferin St · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a third storey addition with a third storey deck. Also, to convert this dwelling from two-units into four-units (one primary unit and three secondary suites).
100 m away · filed Apr 11, 2022 · Approved
89 Regal Rd · Consent
To obtain consent to sever the property into two residential lots.
100 m away · filed Mar 14, 2022 · Approved
89 Regal Rd · Minor variance
To construct a new three-storey detached dwelling with a front integral garage, a rear ground level deck with a walkout basement, front and rear second storey balconies, and a rear third storey balcony.
100 m away · filed Mar 14, 2022 · Approved
89 Regal Rd · Minor variance
To construct a new three-storey detached dwelling with a front integral garage, a rear ground level deck with a walkout basement, front and rear second storey balconies, and a rear third storey balcony.
100 m away · filed Mar 14, 2022 · Approved
23 Northcliffe Blvd · Minor variance
To alter the existing 2½-storey detached dwelling by constructing a two-storey rear addition and a ground floor rear deck.
180 m away · filed Jan 11, 2022 · Approved
75 Regal Rd · Minor variance
To alter the existing 2½-storey detached dwelling by constructing a two-storey rear addition, a second storey addition, and a second storey rear deck with a hot tub.
190 m away · filed Oct 22, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.