Toronto address · Ward 5, York South-Weston
20 Blakley Ave
The City of Toronto has 5 building permits since 2017 (3 still open) and 2 Committee of Adjustment files on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Not started
Small residential project · New laneway / rear yard suite
Proposal for a 2 storey garden suite
Applied Sep 17, 2026 · 1 home added · Permit 26 239523 BLD
- Not started
Heating and ventilation
HVAC - Proposal for a 2 storey garden suite
Applied Sep 17, 2026 · Permit 26 239523 HVA
- Closed
Heating and ventilation
HVAC - Proposed basement walk-out, inerior alterations, 1-storey addition and second storey addition to an existing single family detached dwelling.
Applied Jul 5, 2018 · issued Jul 30, 2018 · completed May 20, 2021 · Permit 18 171320 HVA
- Closed
Plumbing
Plumbing - Proposed basement walk-out, inerior alterations, 1-storey addition and second storey addition to an existing single family detached dwelling.
Applied Jul 5, 2018 · issued Jul 30, 2018 · completed May 20, 2021 · Permit 18 171320 PLB
- Inspections under way
Small residential project · Multiple projects
Proposed basement walk-out, inerior alterations, 1-storey addition and second storey addition to an existing single family detached dwelling.
Applied Jun 4, 2018 · issued Jul 30, 2018 · Permit 18 171320 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a second storey addition above the existing detached garage. The altered garage will be converted into a garden suite.
Decision: Approved (hearing May 28, 2026)
Filed May 26, 2025 · File A0205/25EYK
- Closed
Minor variance · R addition
To construct a one-storey rear addition, new second storey addition, a basement walkout and rear yard deck.
Decision: Approved (hearing Apr 26, 2018)
Filed Mar 15, 2018 · File A0248/18EYK
What’s planned nearby
Development sites within 500 m
- Under review
- Under review
11 storeys · 72 homes · Residential
290 m away · Site plan · Under review · filed Mar 16, 2026
- Under review
11 storeys · 537 homes · Mixed use
410 m away · Site plan · Under review · filed Apr 26, 2022
- Under review
- Under review
11 storeys · 292 homes · Mixed use
460 m away · Site plan · Under review · filed Apr 26, 2022
Neighbours’ Committee of Adjustment files within 250 m
9 Ravenal St · Minor variance
To construct a two-storey rear addition and a basement walk-out in the front yard.
60 m away · filed Oct 6, 2022 · Approved
6 Norval St · Minor variance
To construct a two-storey rear addition and a deck in the rear yard.
240 m away · filed Feb 22, 2022 · Approved
48 Norval St · Minor variance
To convert the existing attached garage to habitable space.
250 m away · filed Feb 1, 2021 · Approved
28 Criscoe St · Minor variance
To construct a new detached dwelling. The existing detached garage in the rear yard will be maintained.
160 m away · filed Dec 16, 2020 · Refused
36 Ravenal St · Minor variance
To construct a new ancillary structure (detached garage) in the rear yard.
100 m away · filed Jun 18, 2019 · Approved
40 Norval St · Minor variance
To construct a two-storey rear addition and a new front porch.
230 m away · filed Jun 13, 2019 · Approved
29 Blakley Ave · Minor variance
To construct a second storey addition, a new front porch, a new rear yard deck and to create a secondary suite.
60 m away · filed Jan 10, 2019 · Approved
19 Ravenal St · Minor variance
To maintain the existing driveway.
40 m away · filed Sep 7, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.