Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 5, York South-Weston

20 Dunraven Dr

The City of Toronto has 3 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Proposal to construct a rear one storey addition with concrete porch and porch at front

    Applied May 22, 2012 · issued May 28, 2012 · Permit 12 177193 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal to construct a rear one storey addition with rear concrete porch and porch at front

    Applied May 22, 2012 · issued May 28, 2012 · Permit 12 177193 PLB

    Inspections under way
  • Small residential project · Porch

    verandah & cold storage with basement entrance & garage to the rear & brick front

    Applied Jun 8, 2005 · issued Jun 8, 2005 · completed Feb 6, 2026 · Permit 05 140585 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 14 Haverson Blvd · Minor variance

    To construct a second storey addition above the existing dwelling.

    130 m away · filed Jul 31, 2026 · Approved

  • 402 Blackthorn Ave · Minor variance

    To enclose the existing rear porch.

    180 m away · filed Mar 18, 2025 · Approved

  • 342 Gilbert Ave · Minor variance

    To alter the existing two-storey ancillary building (detached garage), abutting Bronco Avenue, by converting the second floor into a new second storey garden suite, constructing a front (east) walkout, and reconstructing the exterior south side staircase. The garage area would remain on the ground level of the ancillary building. The existing one-storey detached main dwelling on the property would remain unaltered.

    250 m away · filed Aug 2, 2023 · Approved

  • 68 Haverson Blvd · Minor variance

    To legalize and to maintain the new dwelling with a detached garage in the rear yard that is currently under construction. A previous Committee of Adjustment application (A0483/20EYK) approved a second storey addition above the existing dwelling, a two-storey rear addition and a rear detached garage with variances related to floor space index, length, depth, lot coverage of an ancillary structure and side yard setback of an ancillary structure.

    200 m away · filed Jun 9, 2023 · Approved

  • 323 Gilbert Ave · Minor variance

    To construct a new three-storey four-unit detached dwelling (fourplex) with a front covered porch, front and rear basement level patios, and a rear three-storey staircase structure that will lead to rear balconies (on each level). Also, to construct an ancillary building (storage shed) in the rear yard.

    240 m away · filed May 1, 2023 · Approved

  • 70 Haverson Blvd · Minor variance

    To construct a new dwelling.

    230 m away · filed Jan 27, 2023 · Approved

  • 358 Gilbert Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second storey addition with front and rear balconies, and a ground level deck.

    200 m away · filed Nov 30, 2022 · Approved

  • 20 Kenora Cres · Minor variance

    To construct a two-storey rear addition and a new front porch.

    220 m away · filed Oct 5, 2022 · Approved

Everything planned in York South-Weston

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.