Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

20 Gilbert Ave

The City of Toronto has 1 Committee of Adjustment file on record for this address.

Building permits

The City lists no building permits for this address since 2017, and none still open from before.

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a two-storey front addition and a second storey rear addition.

    Decision: Approved (hearing Jul 13, 2017)

    Filed Apr 5, 2017 · File A0357/17EYK

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 7 Howick Ave · Minor variance

    To legalize and to maintain the rear second storey addition (including a staircase leading to this addition), to the existing two-storey semi-detached dwelling, that was constructed without an authorized building permit.

    240 m away · filed Apr 24, 2026 · Approved

  • 20 Howick Ave · Minor variance

    To construct a new three-storey detached dwelling with a covered front porch with stairs, a side (east) second storey patio, a rear ground floor deck, and a rear third storey deck. Also, to construct a rear one-storey detached ancillary building (shed). The existing front yard parking pad and driveway will be removed.

    220 m away · filed Apr 9, 2026 · Approved

  • 17 Gilbert Ave · Minor variance

    To legalize and to maintain the existing rear one-storey addition (attached shed), which was constructed without an authorized building permit. Also, to convert the existing basement level into a residential dwelling unit. There will be a total of two residential dwelling units on this lot (one unit occupying the ground and second levels, and one unit occupying the basement level).

    50 m away · filed Mar 2, 2026 · Approved

  • 25 Gilbert Ave · Minor variance

    To alter the existing one-storey ancillary building (detached garage abutting the laneway) by constructing a complete second storey addition (that will be cantilevered) for one laneway suite. There will be a total of two residential dwelling units on this lot (one unit occupying the main dwelling and one unit occupying the second level of the ancillary building).

    50 m away · filed May 29, 2025 · Approved

  • 169 Caledonia Rd · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a complete third floor addition with rear rooftop deck.

    250 m away · filed Jul 24, 2024 · Approved

  • 28 Gilbert Ave · Minor variance

    To legalize and to maintain the existing side (north) second storey addition (above the rear covered porch), which was constructed without an authorized building permit. Also, to maintain the enclosed front porch, the side (north) carport canopy and parking space, the rear canopy, and the rear one-storey ancillary buildings (sheds).

    20 m away · filed Mar 28, 2024 · Approved

  • 110 McRoberts Ave · Minor variance

    To construct a new three-storey detached dwelling with a front third storey balcony, a front covered porch, and a rear ground floor deck. The existing rear shed and the rear parking space (abutting the laneway) will be maintained and unaltered.

    210 m away · filed Sep 12, 2023 · Approved

  • 60 Blackthorn Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a two-storey rear addition, a rear raised deck with stairs, and an ancillary structure (shed) in the rear yard.

    250 m away · filed Oct 6, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.