Toronto address · Ward 9, Davenport
20 Muir Ave
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Multiple projects
Construct open verandah with cold storage cellar under at front; excavate to lower basement & underpin; also re-construct roof of dwelling.
Applied Jun 4, 2004 · issued Jun 28, 2004 · completed Jan 15, 2020 · Permit 04 143736 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
6 storeys · 19 homes · Residential
470 m away · Site plan · Approved · filed Jul 10, 2025
- Under review
1-3 Boland Lane and 646-648 Dufferin Street
8 storeys · 135 homes · Residential
480 m away · Condominium · Under review · filed Oct 12, 2021
Neighbours’ Committee of Adjustment files within 250 m
23 Lindsey Ave · Minor variance
To alter the two-and-one-half-storey semi-detached dwelling (fronting Lindsey Avenue) by constructing a rear one-storey addition (attached garage), abutting Gladstone Avenue. Previous Minor Variance Application File A1056/23TEY for a similar proposal was recently refused.
220 m away · filed Sep 26, 2024 · Approved
41 Muir Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear one-storey addition with a rear second storey deck above and a new rear ground floor deck. The existing rear deck with stairs will be demolished. The existing ancillary building (attached garage), in the rear yard, abutting the laneway, will be maintained and unaltered.
110 m away · filed Jan 29, 2024 · Approved
1105 College St · Minor variance
To legalize and to maintain the rear one-storey addition with a deck that were constructed without an authorized building permit. Also, to alter the existing two-and-one-half-storey semi-detached mixed-use building by constructing a new rear second storey balcony, and a new canopy for the existing rear basement walkout.
250 m away · filed Jan 11, 2024 · Approved
23 Lindsey Ave · Minor variance
To alter the two-and-one-half-storey semi-detached dwelling (fronting Lindsey Avenue) by constructing a rear one-storey addition (attached garage), abutting Gladstone Avenue.
220 m away · filed Dec 13, 2023 · Refused
744 Dufferin St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by reconstructing and extending the rear second storey addition, and to construct a two-storey front addition, a ground floor front verandah and stairs, as well as a new front basement patio and walkout. Also, the basement will be converted into a secondary suite, and the existing garage, in the rear yard, will be demolished (and replaced with a parking pad).
170 m away · filed Oct 19, 2023 · Approved
755 Dufferin St · Minor variance
To alter the existing one-storey semi-detached ancillary building (garage) by constructing a partial ground floor front addition and a second storey addition. The existing parking space will be removed, and this building will contain one garden suite.
150 m away · filed Oct 4, 2023 · Approved
757 Dufferin St · Minor variance
To alter the existing one-storey semi-detached ancillary building (garage) by constructing a partial ground floor front addition and a second storey addition. The existing parking space will be removed, and this building will contain one garden suite.
130 m away · filed Oct 4, 2023 · Approved
765 Dufferin St · Minor variance
To construct a parking pad in the front yard of an existing two-storey semi-detached dwelling. A new porch with stairs will also be constructed and the existing front porch and stairs will be demolished.
110 m away · filed Sep 7, 2023 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.