Toronto address · Ward 13, Toronto Centre
20 Sackville Pl
The City of Toronto has 3 building permits since 2017 (3 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation
HVAC - Proposal for 2 storey addition, partial 3rd floor addition and interior alterations
Applied Dec 12, 2018 · issued Jan 7, 2019 · Permit 18 267858 HVA
- Inspections under way
Small residential project · Multiple projects
Proposal for 2 storey addition, partial 3rd floor addition and interior alterations
Applied Dec 12, 2018 · issued Jan 4, 2019 · Permit 18 267858 BLD
- Inspections under way
Plumbing
Plumbing - Proposal for 2 storey addition, partial 3rd floor addition and interior alterations
Applied Dec 12, 2018 · issued Jan 4, 2019 · Permit 18 267858 PLB
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing two-storey semi-detached dwelling by constructing a third storey addition, a three-storey rear addition and a deck.
Decision: Approved (hearing Sep 20, 2018)
Filed Apr 16, 2018 · File A0409/18TEY
What’s planned nearby
Development sites within 500 m
- Under appeal
10 storeys · 60 homes · Mixed use
370 m away · Rezoning · Under appeal · filed Mar 17, 2023
- Under review
11 storeys · Mixed use
480 m away · Site plan · Under review · filed May 26, 2026
- Under review
591 Dundas Street East and 325 Gerrard Street East
26 storeys · 271 homes · Non-residential
490 m away · Site plan · Under review · filed Jan 13, 2025
Neighbours’ Committee of Adjustment files within 250 m
26 Sackville Pl · Minor variance
20 m away · filed Sep 25, 2026 · Accepted
393 Carlton St · Minor variance
To alter the existing three-storey rowhouse dwelling by enlarging the existing ground floor covered front porch with new front stairs and a new front basement walkout.
170 m away · filed Jun 11, 2026 · Approved
407 Carlton St · Minor variance
To alter the existing two-and-one-half-storey townhouse by converting the attic into habitable space and to construct a rear third storey addition with a balcony.
210 m away · filed Mar 25, 2026 · Approved
21 Metcalfe St · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear (east) ground floor addition and a rear third storey addition with a rear roof deck.
240 m away · filed Mar 11, 2026 · Approved
32 Salisbury Ave · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a rear third storey addition (enclosing a portion of the existing terrace).
190 m away · filed Jun 11, 2025 · Approved
2 Geneva Ave · Minor variance
To alter the existing two-storey rowhouse dwelling by constructing a partial rear second storey addition with a rear juliette balcony. The existing rear second storey roof deck will be demolished.
190 m away · filed Apr 8, 2025 · Approved
49 Salisbury Ave · Minor variance
To alter the existing two-and-one-half storey semi-detached dwelling by constructing a west side one-storey addition with new basement area below, and a west side three-storey elevator addition. Also the existing west side deck will be demolished. This site has heritage designation.
130 m away · filed May 13, 2024 · Approved
17 Metcalfe St · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition above the existing rear two-storey portion of the dwelling.
240 m away · filed Apr 22, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.