Toronto address · Ward 9, Davenport
20 Wade Ave
Tamil Co-Op Homes
The City of Toronto has 4 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation · Other
Proposal to replace the generator and associated equipment in an existing apartment building.
Applied Apr 4, 2019 · issued May 13, 2019 · completed Jan 22, 2020 · Permit 19 135696 MSA
- Closed
Fire and security upgrade · Fire alarm
Proposal to install fire alarms in an existing apartment building. This is a Retrofit Project under Part 9 of Fire Code, and there Voice Communication is not within scope of this project.
Applied May 15, 2018 · issued Jun 28, 2018 · completed Jun 17, 2019 · Permit 18 159136 FSU
- Inspections under way
Addition or alteration · Other
Proposal for garage restoration, full replacement of traffic membrane, expansion joint seals and floor drains, localized concrete repairs to the concrete and steel forming the suspended slabs, ledge beams and vertical surfaces of the foundation walls, columns and shear walls. Balconies floor slabs to be repaired and full balcony guard replacement. Roofs to have concrete removed from parapet walls and planters and construct new parapets.
Applied Apr 20, 2017 · issued Apr 26, 2017 · Permit 17 146646 BLD
- Inspections under way
Plumbing · Backflow prevention devices (Water only)
Proposal to install one backflow device
Applied Nov 12, 2009 · issued Nov 16, 2009 · Permit 09 187613 PSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
510-514 Lansdowne Avenue and 1293-1301 Bloor Street West
28 storeys · Mixed use
170 m away · Site plan · Under review · filed Aug 9, 2022
- Under review
33 storeys · 634 homes · Mixed use
180 m away · Site plan · Under review · filed Aug 30, 2021
- Under review
21 storeys · 861 homes · Residential
190 m away · Site plan · Under review · filed Nov 7, 2024
- Under review
19 storeys · 325 homes · Mixed use
340 m away · Condominium · Under review · filed Nov 8, 2021
- Under review
1423-1437 Bloor Street West and 278 Sterling Road
18 storeys · 197 homes · Mixed use
440 m away · Site plan · Under review · filed Aug 20, 2021
- Approved
1167-1175 Bloor Street West, 34-42 Brock Crescent and 90 Croatia Street
14 storeys · 52 homes · Mixed use
450 m away · Rezoning · Approved · filed Feb 9, 2026
Neighbours’ Committee of Adjustment files within 250 m
1286 Bloor St W · Minor variance
To alter the existing three-storey mixed use building by constructing a rooftop mechanical penthouse with rooftop access and a rooftop access enclosure above the third storey with a partially covered rooftop terrace and a trellis. The ground floor and partial ground floor mezzanine level will contain a commercial unit (art gallery and event space). The second storey will contain a multi-function commercial space that supports StepStones for Youth's programming and the provides amenity space for building residents (counselling rooms, a gym, a break room, and an open-concept collaboration space…
190 m away · filed Sep 2, 2026 · Postponed
1281 Bloor St W · Consent
To obtain consent for the technical severance of the property for the purpose of re-establishing two mixed-use lots which merged on title.
180 m away · filed Mar 4, 2026 · Approved
1319 Bloor St W · Consent
To obtain consent to sever the property into two mixed-use lots and to create new easements/rights-of-way.
200 m away · filed Sep 3, 2025 · Approved
763 Lansdowne Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a third storey addition with a rear deck, a rear one-storey addition, and a front second storey deck. Also, to construct a new two-storey ancillary building (detached garage with a workshop and storage space above) in the rear yard, abutting the laneway.
210 m away · filed Aug 26, 2025 · Approved
1319 Bloor St W · Minor variance
To permit the construction of the Bloor Lansdowne SmartTrack GO Station, which consists of the main entrance building (municipally known as 1325 Bloor Street West), and a maintenance building with bicycle parking, and a partially enclosed waste and recycling storage area (municipally known as 17 Dora Avenue). The station also includes a West Access Building as well as other station elements (including the platforms, waiting enclosures, a pedestrian tunnel to access the westerly platform, stairs and elevators) will be located within the rail corridor and not part of the subject lands (municipa…
200 m away · filed Apr 2, 2025 · Approved
1319 Bloor St W · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 589-2022) for a 31-storey and 35-storey mixed-use building, by permitting an increase in building height and total gross floor area, and to modify the building envelope (setbacks and step-backs). There will be a total of 1,100 residential dwelling units on this lot.
200 m away · filed Aug 16, 2024 · Approved
484 Lansdowne Ave · Minor variance
To legalize and to maintain the enclosed front porch addition that was constructed without an authorized building permit.
250 m away · filed Jan 10, 2023 · Approved
493 St Clarens Ave · Minor variance
To convert the existing two-storey semi-detached dwelling (one-unit dwelling into three-units) with a rear basement walkout, and a rear second storey balcony with a staircase leading into the rear yard. This dwelling will have one primary unit and two secondary suites (one within the basement and one on the second level). The two parking spaces in the rear yard (abutting the laneway) will be maintained.
190 m away · filed Nov 16, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.