Toronto address · Ward 25, Scarborough-Rouge Park
200 Murison Blvd
The City of Toronto has 4 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Small residential project · Interior alterations
Relevelling of slab on grade, sistering of floor joists, window and patio door replacement. Paint walls, ceilings and millwork within all floor areas - Unit 90
Applied Oct 3, 2022 · issued Oct 11, 2022 · Permit 22 212178 BLD
- Closed
Plumbing
Plumbing - Proposal for interior alterations on the main floor by adding a 3 piece bathroom.
Applied Apr 29, 2022 · issued May 17, 2022 · completed Nov 19, 2022 · Permit 22 139870 PLB
- Closed
Small residential project · Interior alterations
Proposal for interior alterations on the main floor by adding a 3 piece bathroom.
Applied Apr 29, 2022 · issued May 17, 2022 · completed Oct 7, 2022 · Permit 22 139870 BLD
- Inspections under way
Small residential project · Underpinning
Foundation Underpinning to existing Townhouse
Applied Jun 11, 2020 · issued Sep 15, 2020 · Permit 20 155057 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
1 storeys · 6 homes · Non-residential
400 m away · Site plan · Under review · filed Aug 28, 2022
Neighbours’ Committee of Adjustment files within 250 m
801 Milner Ave · Minor variance
To construct a new five storey self-storage facility. The applicant is coming back to Committee of Adjustment to permit the parking variance which was withdrawn by the applicant at the March hearing (A0328/19SC), due to a misunderstanding.
170 m away · filed Mar 11, 2020 · Approved
801 Milner Ave · Consent
This application is for consent to sever the land into two lots, as shown on the attached Site Plan. Lots to be created Part 4 would have a frontage of 55.6 metres and a lot area of 4,691 square metres. The retained lot would have a frontage of 311.8 metres and a lot area of 73,742 square metres. In order to facilitate the proposed development, relief from the provision of the Zoning By-law was requested, as outlined in A0328/19SC.
170 m away · filed Dec 10, 2019 · Approved
801 Milner Ave · Minor variance
The applicant is seeking relief from the provisions of the Zoning By-law to construct a new five storey self-storage facility.
170 m away · filed Dec 10, 2019 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.