Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

201 Gilbert Ave

The City of Toronto has 9 building permits since 2017 (8 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Revision No.1: Add a laundry in the basement Plumbing - Proposal for addition, interior alterations, wood deck, front porch, walkout.

    Applied Jul 9, 2026 · issued Jul 10, 2026 · Permit 25 150174 PLB (revision 01)

    Revision issued
  • Small residential project · Multiple projects

    REVISION 01: INTERIOR ALTERATIONS REVISION Proposal for addition, interior alterations, wood deck, front porch, walkout.

    Applied Jul 9, 2026 · issued Jul 23, 2026 · Permit 25 150174 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    REV 01: Changes to layoutHVAC - Proposal for addition, interior alterations, wood deck, front porch, walkout.

    Applied Apr 13, 2026 · issued May 19, 2026 · Permit 25 150174 HVA (revision 01)

    Revision issued
  • Small residential project · Garage

    Proposal for a detached garage.

    Applied Aug 8, 2025 · issued Aug 19, 2025 · Permit 25 207485 BLD

    Inspections under way
  • Small residential project · Garage

    Proposal for detached garage.

    Applied Aug 1, 2025 · completed Aug 7, 2025 · Permit 25 204209 BLD

    Cancelled
  • Plumbing

    Plumbing - Proposal for addition, interior alterations, wood deck, front porch, walkout.

    Applied Apr 28, 2025 · issued May 29, 2025 · Permit 25 150174 PLB

    Inspections under way
  • Drains and site services

    Drain - Proposal for addition, interior alterations, wood deck, front porch, walkout.

    Applied Apr 28, 2025 · issued May 29, 2025 · Permit 25 150174 DRN

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for addition, interior alterations, wood deck, front porch, walkout.

    Applied Apr 28, 2025 · issued May 29, 2025 · Permit 25 150174 HVA

    Inspections under way
  • Small residential project · Multiple projects

    Proposal for addition, interior alterations, wood deck, front porch, walkout.

    Applied Apr 28, 2025 · issued May 29, 2025 · Permit 25 150174 BLD

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a new one-storey detached ancillary building (one-car garage) in the rear yard of the existing two-storey dwelling, abutting the laneway.

    Decision: Approved (hearing Jul 9, 2025)

    Filed May 12, 2025 · File A0352/25TEY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 225 Caledonia Rd · Minor variance

    To construct a new one-storey detached ancillary building (one-car garage) in the rear yard, abutting the laneway. The existing garage will be demolished.

    130 m away · filed May 15, 2025 · Approved

  • 66 Innes Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a complete second storey addition. Also, to remove the enclosed front porch and construct a covered front porch.

    170 m away · filed May 31, 2024 · Approved

  • 225 Gilbert Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a two-storey rear and side (north) addition, a side (north) basement walkout, and a rear ground floor deck.

    70 m away · filed Feb 26, 2024 · Approved

  • 195 Gilbert Ave · Minor variance

    To construct a new one-storey ancillary building (detached garage), in the rear yard, abutting the laneway. The existing garage in the rear yard will be demolished.

    20 m away · filed Dec 29, 2023 · Approved

  • 325 McRoberts Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition with a covered rooftop deck above.

    220 m away · filed Dec 29, 2023 · Approved

  • 249 McRoberts Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition and a rear ground floor deck.

    250 m away · filed Dec 12, 2023 · Approved

  • 289 McRoberts Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a front and rear basement addition, a front and rear first storey porch, and a complete second storey. Laneway suite is not part of this application.

    220 m away · filed Apr 24, 2023 · Application withdrawn

  • 289 McRoberts Ave · Minor variance

    To alter the existing one-storey detached dwelling by constructing a front verandah, a rear ground floor deck, a front basement addition, a rear basement walkout, and a complete second storey addition. Also, to construct a two-storey ancillary building (containing a laneway suite) in the rear yard, abutting the laneway, with an east porch, a west basement walkout, and an east second storey balcony. The second level will be cantilevered along the side (south) lot line.

    220 m away · filed Apr 24, 2023 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.