Toronto address · Ward 14, Toronto-Danforth
204 Westwood Ave
The City of Toronto has 3 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Proposed to install new main line full port Back Water Valve (Sewer only)
Applied Jun 1, 2023 · issued Jun 1, 2023 · completed Jun 6, 2023 · Permit 23 154568 DRN
- Closed
Heating and ventilation
HVAC - Interior alterations - remove load bearing wall on main floor
Applied May 26, 2023 · issued Jun 19, 2023 · completed Jul 18, 2023 · Permit 23 147848 HVA
- Inspections under way
Small residential project · Interior alterations
Interior alterations - remove load bearing wall on main floor
Applied May 18, 2023 · issued Jun 7, 2023 · Permit 23 147848 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
28 East York Ave · Minor variance
To alter the existing three-storey townhouse dwelling by constructing an extension to the rear first floor deck (cantilevered over the existing driveway and parking space, which will be maintained and unaltered).
210 m away · filed Sep 2, 2026 · Hearing scheduled
157 Westwood Ave · Minor variance
To construct a new one-storey detached ancillary building (one-car garage), in the rear yard, abutting Carlaw Avenue. The existing detached garage will be demolished.
250 m away · filed Jun 17, 2026 · Hearing scheduled
139 Floyd Ave · Consent
To obtain consent to sever the property into three undersized residential lots.
210 m away · filed Feb 23, 2026 · Hearing scheduled
139 Floyd Ave · Minor variance
To permit an apartment building use by constructing a new three-storey building with front and rear basement walkouts, front and rear covered porches with stairs, front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).
210 m away · filed Feb 23, 2026 · Hearing scheduled
139 Floyd Ave · Minor variance
To permit an apartment building use by constructing a new three-storey building with front and rear basement walkouts, front and rear covered porches with stairs, front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).
210 m away · filed Feb 23, 2026 · Hearing scheduled
139 Floyd Ave · Minor variance
To permit an apartment building use by constructing a new three-storey building with front and rear basement walkouts, front and rear covered porches with stairs, as well as front and rear balconies located on the second and third storeys. There will be a total of six residential dwelling units on this lot (two units occupying the basement level, two units occupying the first level, and two units occupying the second and third levels).
210 m away · filed Feb 23, 2026 · Hearing scheduled
233 Gowan Ave · Minor variance
To alter the existing two-storey detached dwelling (duplex) by constructing a rear third storey addition. There will be a total of two residential dwelling units on this lot (one unit occupying the ground level, and one unit occupying the second and third levels).
230 m away · filed Sep 8, 2025 · Approved
193 Mortimer Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by enclosing the existing front porch into habitable space.
180 m away · filed Feb 19, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.