Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

206 Glenview Ave

The City of Toronto has 4 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - The applicant is also proposing a two-storey rear addition and a third floor addition above the existing two-storey dwelling;and a two-storey front bay window.

    Applied Nov 8, 2018 · issued Nov 21, 2018 · completed Mar 18, 2022 · Permit 17 238395 HVA

    Closed
  • Plumbing

    Plumbing - The applicant is also proposing a two-storey rear addition and a third floor addition above the existing two-storey dwelling;and a two-storey front bay window.

    Applied Mar 27, 2018 · issued Mar 27, 2018 · completed Mar 18, 2022 · Permit 17 238395 PLB

    Closed
  • Drains and site services

    Drain - The applicant is also proposing a two-storey rear addition and a third floor addition above the existing two-storey dwelling;and a two-storey front bay window.

    Applied Mar 27, 2018 · issued Mar 27, 2018 · completed Mar 18, 2022 · Permit 17 238395 DRN

    Closed
  • Small residential project · Multiple projects

    The applicant is also proposing a two-storey rear addition and a third floor addition above the existing two-storey dwelling;and a two-storey front bay window.

    Applied Sep 25, 2017 · issued Nov 28, 2017 · Permit 17 238395 BLD

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a two-storey front bay window. The applicant is also proposing a two-storey rear addition and a third floor addition above the existing two-storey dwelling.

    Decision: Approved (hearing Apr 20, 2017)

    Filed Feb 13, 2017 · File A0129/17NY

    Approved with conditions

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 239 Glenview Ave · Minor variance

    To construct a two (2) storey rear addition to the existing dwelling.

    140 m away · filed Aug 27, 2026 · Hearing scheduled

  • 1451 Avenue Rd · Minor variance

    To permit a temporary ancillary structure (seasonal dome) to enclose an existing sports field (Cohen Field).

    250 m away · filed Mar 26, 2026 · Approved

  • 237 Glenview Ave · Minor variance

    To construct a new detached dwelling, with a rear deck. Please note, the file was deferred on November 7, 2024, to allow the applicant to consult with neighbours and Community Planning.

    120 m away · filed Sep 1, 2024 · refused

  • 187 Glenview Ave · Minor variance

    Proposal to construct a new two-storey single family detached dwelling.

    80 m away · filed Apr 29, 2024 · Approved

  • 362 Rosewell Ave · Minor variance

    Proposal to add sunroom, steps and deck to the existing house

    160 m away · filed Mar 16, 2023 · Approved

  • 199 Glengrove Ave W · Minor variance

    To construct a two storey rear addition. Please note, this application was deferred on March 23, 2023 in order to revise plans.

    170 m away · filed Jan 26, 2023 · Approved

  • 181 Glenview Ave · Minor variance

    To construct a new dwelling.

    110 m away · filed Mar 30, 2022 · Approved

  • 235 Glengrove Ave W · Minor variance

    To construct a third floor addition over existing footprint and a one storey rear addiction. Also to construct a new rear deck, and interior alterations.

    210 m away · filed Feb 23, 2022 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.