Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

2063 Yonge St

The City of Toronto has 4 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing · Backflow prevention devices (Water only)

    Installation of 1.5" DCVA backflow prevention device with expansion tank

    Applied Sep 30, 2022 · issued Dec 23, 2022 · completed Nov 3, 2025 · Permit 22 211232 PSA

    Closed
  • Designated structure · Sign building permit related

    To erect and display one illuminated wall sign******SKIIS & BIIKES

    Applied Apr 18, 2018 · completed Oct 20, 2022 · Permit 18 145308 DST

    Cancelled
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install a backflow prevention device.

    Applied Jun 24, 2016 · issued Jul 28, 2016 · completed Oct 3, 2025 · Permit 16 180100 PSA

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install 1 backflow prevention device in an existing commercial building.

    Applied May 17, 2011 · issued Jun 14, 2011 · completed May 19, 2026 · Permit 11 196452 PSA

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 26 Carey Rd · Minor variance

    To construct a new undersized front yard parking pad, abutting Carey Road. The existing three-storey detached dwelling on the lot will be maintained and unaltered.

    180 m away · filed Dec 4, 2025 · Refused

  • 53 Manor Rd W · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear (south) two-storey addition with a deck and stairs, and a side (west) entrance (abutting Duplex Avenue). The existing rear deck will be demolished.

    200 m away · filed Nov 10, 2025 · Approved

  • 78 Hillsdale Ave E · Minor variance

    To construct a new three-storey detached dwelling (basement level is considered the first storey) with an integral garage, a front porch, a rear basement walkout, and a rear second level deck.

    240 m away · filed Apr 16, 2025 · Approved

  • 2100 Yonge St · Consent

    To obtain consent to a strata severance and to create various easements/rights-of-way.

    70 m away · filed Feb 14, 2025 · Approved

  • 11 Tullis Dr · Minor variance

    To construct a new three-storey detached dwelling with a front covered porch, a rear basement walkout, a rear ground floor deck, a rear second storey balcony with an exterior staircase, and a rear third storey rooftop terrace. This dwelling will have three residential units (triplex). Also, to construct a one-storey ancillary building (detached garage) in the rear yard.

    240 m away · filed Feb 8, 2024 · Approved

  • 52 Manor Rd W · Minor variance

    To construct a new one-storey ancillary building (carport) in the rear yard, abutting Duplex Avenue.

    210 m away · filed Jun 9, 2023 · Approved

  • 2100 Yonge St · Minor variance

    To permit a lower percentage of units with three bedrooms or more within a new 12-storey mixed-use building (that will contain 7 rental replacement suites and a total of 76 residential dwelling units).

    70 m away · filed Apr 26, 2022 · Approved

  • 11 Glebe Rd E · Minor variance

    To alter the existing two-storey detached dwelling by constructing a front integral garage and covered porch, a rear two-storey addition with a ground floor deck, and a partial third storey addition with a rear balcony.

    150 m away · filed Mar 8, 2022 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.