Toronto address · Ward 12, Toronto-St. Paul's
2075 Yonge St
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Addition or alteration · Interior alterations
REV 01: Revised stair layout and ceiling construction.Interior alterations to new tenant - Global Pet Foods
Applied Jun 2, 2025 · issued Jun 27, 2025 · completed Jul 28, 2025 · Permit 25 135995 BLD (revision 01)
- Closed
Addition or alteration · Interior alterations
Interior alterations to new tenant - Global Pet Foods
Applied Mar 27, 2025 · issued Apr 22, 2025 · completed Jul 28, 2025 · Permit 25 135995 BLD
- Closed
Plumbing · Backflow prevention devices (Water only)
Proposal to install a 1" DVCA Back Flow Prevention Device in the existing bank.
Applied Jan 6, 2017 · issued Feb 3, 2017 · completed Jul 27, 2017 · Permit 17 101663 PSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
40-50 Tullis Drive and 2039-2049 Yonge Street
11 storeys · Mixed use
90 m away · Site plan · Under review · filed Aug 22, 2022
- Under review
- Approved
2010-2050 Yonge Street and 15 Lola Road
14 storeys · Mixed use
170 m away · Rezoning · Approved · filed Jan 7, 2026
- Under review
14 storeys · 274 homes · Mixed use
170 m away · Site plan · Under review · filed Nov 8, 2021
- Under review
49 storeys · 552 homes · Residential
190 m away · Site plan · Under review · filed Jul 10, 2025
- Approved
Neighbours’ Committee of Adjustment files within 250 m
2161 Yonge St · Minor variance
To alter the development standards for the 38-storey mixed-use building (approved under Site Specific Zoning By-Law 153-2022(OLT)), to permit six obstructed parking spaces with a reduced width (located on parking levels P1 to P5).
230 m away · filed Jun 15, 2026 · Approved
26 Carey Rd · Minor variance
To construct a new undersized front yard parking pad, abutting Carey Road. The existing three-storey detached dwelling on the lot will be maintained and unaltered.
200 m away · filed Dec 4, 2025 · Refused
53 Manor Rd W · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear (south) two-storey addition with a deck and stairs, and a side (west) entrance (abutting Duplex Avenue). The existing rear deck will be demolished.
200 m away · filed Nov 10, 2025 · Approved
78 Hillsdale Ave E · Minor variance
To construct a new three-storey detached dwelling (basement level is considered the first storey) with an integral garage, a front porch, a rear basement walkout, and a rear second level deck.
210 m away · filed Apr 16, 2025 · Approved
2100 Yonge St · Consent
To obtain consent to a strata severance and to create various easements/rights-of-way.
40 m away · filed Feb 14, 2025 · Approved
57 Soudan Ave · Minor variance
To permit the continued use on the site as a dental office, as well as to permit the conversion of the second floor of the building into additional dentist office space.
230 m away · filed Jan 27, 2025 · Approved
2161 Yonge St · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 153-2022(OLT)) for a 38-storey mixed-use building by increasing the residential gross floor area (for a total of 380 residential dwelling units), reducing the commercial (office) gross floor area, and reducing the number of required parking spaces. Also, to permit a home occupation use (personal service shop) within the building, and to reduce the required width of 4 obstructed parking spaces.
230 m away · filed Jun 17, 2024 · Approved
52 Manor Rd W · Minor variance
To construct a new one-storey ancillary building (carport) in the rear yard, abutting Duplex Avenue.
200 m away · filed Jun 9, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.