Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 12, Toronto-St. Paul's

2099 Dufferin St

The City of Toronto has 5 building permits since 2017 (5 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    Revisio 01 - front yard parkingConvert the existing dwelling into two units, rear two storey addition, second floor addition and front porch

    Applied May 8, 2022 · issued Jun 13, 2022 · Permit 21 145501 BLD (revision 01)

    Revision issued
  • Small residential project · Deck

    Proposed wood deck addition to existing SFD

    Applied Nov 15, 2021 · issued Dec 21, 2021 · Permit 21 237760 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Convert the existing dwelling into two units, rear two storey addition, second floor addition and front porch

    Applied Aug 3, 2021 · issued Aug 6, 2021 · Permit 21 145501 HVA

    Inspections under way
  • Plumbing

    Plumbing - Convert the existing dwelling into a duplex - rear two storey addition and second floor addition

    Applied Apr 24, 2021 · issued Jul 2, 2021 · Permit 21 145501 PLB

    Inspections under way
  • Small residential project · Multiple projects

    Convert the existing dwelling into two units, rear two storey addition, second floor addition and front porch

    Applied Apr 24, 2021 · issued Jul 2, 2021 · 1 home added · Permit 21 145501 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 13 Woodcroft Cres · Minor variance

    200 m away · filed Jul 30, 2026 · Postponed

  • 29 Hatherley Rd · Minor variance

    To construct a new rear one-storey detached ancillary building (containing one garden suite), with a basement level and a first floor juliet balcony on the south side. There will be a total of five residential dwelling units on this lot (four units within the main building, and one unit within the ancillary building).

    170 m away · filed Mar 18, 2026 · Approved

  • 484 Westmount Ave · Minor variance

    To construct a new two-storey ancillary building containing one garden suite, in the rear yard. There will be a total of five residential dwelling units on this lot (four units within the main dwelling and one unit within the ancillary building).

    50 m away · filed Jul 22, 2025 · Approved

  • 486 Northcliffe Blvd · Minor variance

    To construct a two-storey ancillary building containing one garden suite, in the rear yard of the fourplex (currently under construction as approved in Minor Variance Decision A0730/24TEY). There will be a total of five residential dwelling units on this lot (four units occupying the fourplex and one unit occupying the ancillary building).

    140 m away · filed Jun 12, 2025 · Approved

  • 2169 Dufferin St · Minor variance

    To legalize and to maintain the front porch and stairs, that were constructed without an authorized building permit. The previous front porch and stairs were demolished.

    230 m away · filed Dec 2, 2024 · Refused

  • 484 Westmount Ave · Minor variance

    To construct a new three-storey detached dwelling (fourplex) with a rear basement walkout entry with stairs, and a sunken patio. The existing one-storey detached dwelling, and rear yard detached shed will be demolished. There will be four dwelling units on the lot.

    50 m away · filed Sep 11, 2024 · Approved

  • 486 Northcliffe Blvd · Minor variance

    To construct a new three-storey detached fourplex dwelling with a rear basement walkout entry, rear balconies on the first, second, and third floors, and a front third floor balcony. The existing ancillary building (detached garage) will be maintained. The existing one-storey detached dwelling will be demolished. There will be four dwelling units on the lot.

    140 m away · filed Aug 17, 2024 · Approved

  • 406 Northcliffe Blvd · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear second storey addition and a complete third storey addition with a rear third storey balcony (above the second storey portion of the dwelling).

    240 m away · filed Jul 30, 2024 · Approved

Everything planned in Toronto-St. Paul's

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.