Toronto address · Ward 22, Scarborough-Agincourt
21 Colinayre Cres
The City of Toronto has 3 building permits since 2017 (3 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Plumbing
Plumbing - Proposed basement suite with basement walk-out.
Applied Aug 14, 2017 · issued Oct 6, 2017 · Permit 17 216043 PLB
- Inspections under way
Drains and site services
Drain - Proposed basement suite with basement walk-out.
Applied Aug 14, 2017 · issued Oct 6, 2017 · Permit 17 216043 DRN
- Inspections under way
Small residential project · Second suite (New)
Proposed basement suite with basement walk-out.
Applied Aug 14, 2017 · issued Oct 6, 2017 · 1 home added · Permit 17 216043 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
15 Norcap Ave · Minor variance
The existing house was constructed with additional floor area that exceeds the maximum floor area permitted by the zoning by-law. The additional floor area was created by extending the second floor into an open two-storey family room inside the house, and by extending the second floor over the garage at the front of the house. The applicants are applying for a variance to permit the increased floor area.
90 m away · filed Oct 16, 2018 · Refused
24 Clydebank Blvd · Minor variance
Proposal to construct a new two storey single-family house.
220 m away · filed Mar 9, 2018 · Approved
1 Norcap Ave · Minor variance
To construct a new detached dwelling with an integral garage. The existing detached dwelling will be demolished.
80 m away · filed Sep 26, 2016 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.