Toronto address · Ward 14, Toronto-Danforth
21 First Ave
The City of Toronto has 2 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
Plumbing - Proposed interior renovations, new kitchen, new powder room, interior structural (hallway opened up), garden wall structural open up
Applied Feb 21, 2023 · issued Mar 8, 2023 · completed Feb 14, 2024 · Permit 23 116012 PLB
- Closed
Small residential project · Interior alterations
Proposed interior renovations, new kitchen, new powder room, interior structural (hallway opened up), garden wall structural open up
Applied Feb 21, 2023 · issued Mar 8, 2023 · completed Feb 14, 2024 · Permit 23 116012 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
51 homes · Residential
240 m away · Site plan · Under review · filed Apr 24, 2024
Neighbours’ Committee of Adjustment files within 250 m
47 Simpson Ave · Minor variance
To alter the rear existing one-storey ancillary building (detached garage) by constructing a complete second storey addition (containing one garden suite). There will be a total of two residential dwelling units on this lot (one unit within the main dwelling and one unit within the ancillary building).
220 m away · filed May 5, 2026 · Approved
162 Boulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition and a side (south) third floor balcony.
220 m away · filed Apr 17, 2026 · Approved
563 Gerrard St E · Minor variance
To construct a new mixed-use development (common-element condominium) containing a three-storey townhouse development (reviewed as a mixed-use building) containing 12 units (including two live/work units) with front porches with stairs, front third storey balconies, rear ground floor decks, side (east and west) second floor balconies, rooftop decks, rear below-grade integral garages and one rear (south) surface parking space. Also, to construct a three-storey detached house (Unit 13) at the rear of the lot, fronting Munroe Street, with a covered front (west) porch with stairs, a side (north)…
210 m away · filed Nov 17, 2025 · Approved
242 Boulton Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by enclosing the existing front porch (for habitable space).
190 m away · filed Sep 8, 2025 · Approved
310 Broadview Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached mixed-use building by constructing a rear three-storey addition. There will be a total of one commercial unit (hair salon) and two residential dwelling units on this lot (one existing commercial unit occupying the first level, one existing dwelling unit occupying the second and third levels, as well as one new dwelling unit occupying the first, second and third levels).
90 m away · filed Jul 31, 2025 · Approved
674 Gerrard St E · Minor variance
To convert the existing two-storey mixed-use building into a hotel.
230 m away · filed Oct 16, 2024 · Approved
666 Gerrard St E · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear three-storey addition, a front basement walkout, a side (east) third storey balcony, and rear second and third storey terraces. This building will contain a total of five residential dwelling units.
220 m away · filed Apr 18, 2024 · Approved
296 Broadview Ave · Minor variance
To alter the existing detached building (Church) by converting the use from Place of Worship to a Community Centre (with Entertainment Place of Assembly (Live music events) and Eating Establishment (bar/café) uses), which will be managed by a non-profit organization.
120 m away · filed Jan 18, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.