Toronto address · Ward 13, Toronto Centre
21 Melinda St
The City of Toronto has 27 building permits since 2017 (9 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Application on hold
Fire and security upgrade
FS - Sprinkler Shop Drawing - Proposed interior alterations-demolition of interior partition layout and ceilings back to base condition. Washroom renovation and plumbing fixture/finish refresh.
Applied Aug 13, 2026 · Permit 26 188633 FSU
- Permit issued
Addition or alteration · Interior demolition
Proposed interior alterations-demolition of interior partition layout and ceilings back to base condition. Washroom renovation and plumbing fixture/finish refresh.
Applied Jun 21, 2026 · issued Aug 19, 2026 · Permit 26 188633 BLD
- Permit issued
Plumbing
Plumbing - Proposed interior alterations-demolition of interior partition layout and ceilings back to base condition. Washroom renovation and plumbing fixture/finish refresh.
Applied Jun 21, 2026 · issued Aug 18, 2026 · Permit 26 188633 PLB
- Permit issued
Heating and ventilation
HVAC - Proposed interior alterations-demolition of interior partition layout and ceilings back to base condition. Washroom renovation and plumbing fixture/finish refresh.
Applied Jun 21, 2026 · issued Aug 18, 2026 · Permit 26 188633 HVA
- Inspections under way
Fire and security upgrade · Sprinklers
Remove up to thirty (30) existing sprinkler heads,, supply and install up to forty-seven (47) new concealed type sprinkler heads c/w white cover plates, supply and install up to thirty-six (36) new upright type sprinkler heads, supply and install one (1) new 10 lbs. ABC type standard dry chemical fire extinguisher c/w wall mounting brackets and signage.
Applied May 15, 2026 · issued Jun 17, 2026 · Permit 26 161599 FSU
- Inspections under way
Plumbing
Plumbing - Proposal for interior alterations for office fit out on floor 9.
Applied Mar 3, 2026 · issued Apr 14, 2026 · Permit 26 123987 PLB
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations for office fit out on floor 9.
Applied Mar 3, 2026 · issued Apr 14, 2026 · Permit 26 123987 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposal for interior alterations for office fit out on floor 9.
Applied Mar 3, 2026 · issued Apr 14, 2026 · Permit 26 123987 HVA
- Closed
Fire and security upgrade · Electromagnetic locks
Proposal to install 2 electromagnectic locks on the 8th floor.
Applied Jan 15, 2026 · issued Jan 16, 2026 · completed May 21, 2026 · Permit 26 105067 FSU
- Closed
Plumbing
Plumbing - Proposal for interior alterations including demolition of interior partitions. Floor 10.
Applied Dec 12, 2025 · issued Jan 14, 2026 · completed Jul 9, 2026 · Permit 25 265658 PLB
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations including demolition of interior partitions. Floor 10.
Applied Dec 12, 2025 · issued Jan 14, 2026 · completed Jul 17, 2026 · Permit 25 265658 BLD
- Closed
Heating and ventilation
HVAC - Proposal for interior alterations including demolition of interior partitions. Floor 10.
Applied Dec 12, 2025 · issued Jan 14, 2026 · completed Jul 9, 2026 · Permit 25 265658 HVA
Show 15 more permits
- Closed
Heating and ventilation
REVISION TO OPEN PERMIT 23 159558 BLD 00 BA. DELETED BOARDROOM 10-34, PHONE ROOMS 10-16 AND 10-15. ENLARGED SERVERY 10-17.HVAC - Proposed Interior Alterations to the existing office
Applied Oct 11, 2023 · issued Oct 24, 2023 · completed Jun 27, 2024 · Permit 23 159558 HVA (revision 01)
- Closed
Addition or alteration · Interior alterations
REV 01 - DELETED BOARDROOM 10-34, PHONE ROOMS 10-16 & 10-15. ENLARGED SERVERY 10-17.Proposal for interior alterations to the existing 10th floor level for a new office tenant.
Applied Oct 11, 2023 · issued Nov 14, 2023 · completed Aug 30, 2024 · Permit 23 159558 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Proposed Interior Alterations to the existing office
Applied Jun 12, 2023 · issued Aug 18, 2023 · completed Jun 27, 2024 · Permit 23 159558 HVA
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations to the existing 10th floor level for a new office tenant.
Applied Jun 12, 2023 · issued Jul 12, 2023 · completed Aug 30, 2024 · Permit 23 159558 BLD
- Closed
Fire and security upgrade · Electromagnetic locks
Adding maglock to a double door as noted in the electrical drawings- level 12
Applied Dec 15, 2022 · issued Dec 21, 2022 · completed May 13, 2025 · Permit 22 240063 FSU
- Cancelled
Fire and security upgrade · Electromagnetic locks
Adding maglock to a double door as noted in the electrical drawings- level 12
Applied Nov 9, 2022 · completed Nov 29, 2022 · Permit 22 227613 FSU
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations to portions of the 12th floor level for existing office tenant - 'CIBC' at Commerce Court East.
Applied Jul 13, 2022 · issued Jul 26, 2022 · Permit 22 175881 BLD
- Closed
Heating and ventilation
HVAC - Proposal to constuct interior alterations to the 12th floor of the CIBC Commerce Court East.
Applied Jul 13, 2022 · issued Aug 11, 2022 · completed Feb 18, 2026 · Permit 22 175881 HVA
- Closed
Heating and ventilation
HVAC - Interior alterations to the 8th floor - CIBC
Applied May 24, 2017 · issued Jun 14, 2017 · completed Jun 7, 2019 · Permit 17 165108 HVA
- Closed
Addition or alteration · Interior alterations
Interior alterations to the 8th floor - CIBC
Applied May 24, 2017 · issued Jun 5, 2017 · completed May 29, 2019 · Permit 17 165108 BLD
- Closed
Heating and ventilation · Alter: add on /Ductwork
Proposal to replace the ductwork to the kitchen of the restaurant.
Applied May 3, 2017 · issued May 31, 2017 · completed Jan 30, 2018 · Permit 17 153089 MSA
- Cancelled
Heating and ventilation · Alter: Boiler/Furnace/AC replacement
Proposal to replace the new A/C unit in an existing office building.
Applied May 2, 2016 · issued Jul 8, 2016 · completed Nov 26, 2017 · Permit 16 149170 MSA
- Closed
Fire and security upgrade · Electromagnetic locks
Retro-fit modification to the existing maglock power supply's.(26 maglocks)
Applied Sep 13, 2014 · issued Sep 29, 2014 · completed Apr 11, 2018 · Permit 14 221443 FSU
- Closed
Heating and ventilation
HVAC - Interior alterations to existing Office Suite on 8th floor. Multi Tenant Floor
Applied Jul 16, 2008 · issued Aug 12, 2008 · completed Jun 3, 2020 · Permit 08 182773 HVA
- Closed
Heating and ventilation · Other
Extension of existing Diesel exhaust pipes to roof level. Office Building
Applied Jun 6, 2008 · issued Jun 17, 2008 · completed Dec 19, 2017 · Permit 08 166689 MSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
65 storeys · 649 homes · Mixed use
40 m away · Site plan · Under review · filed Apr 7, 2025
- Under review
187-199 Bay Street, 18-30 Wellington Street West and 3 other streets
64 storeys · Residential
50 m away · Site plan · Under review · filed Aug 26, 2021
- Under review
68 storeys · 836 homes · Residential
90 m away · Rezoning · Under review · filed Oct 21, 2024
- Under review
66 storeys · 511 homes · Mixed use
90 m away · Site plan · Under review · filed Apr 27, 2022
- Under review
60 storeys · 256 homes · Mixed use
90 m away · Condominium · Under review · filed Nov 8, 2021
- Under review
1-3 King Street East and 69-71 Yonge Street
15 storeys · 127 homes · Residential
100 m away · Site plan · Under review · filed Nov 7, 2021
Neighbours’ Committee of Adjustment files within 250 m
20 King St W · Minor variance
To alter the existing 12-storey mixed-use building by enclosing the front outdoor patio of the ground floor eating establishment (restaurant).
140 m away · filed May 6, 2026 · Approved
20 Wellington St E · Consent
To obtain consent to sever a portion of the land for the purpose of a lot addition and to create new easements/rights-of-ways (some stratified).
150 m away · filed Apr 16, 2025 · Approved
34 King St E · Minor variance
To alter the development standards for the 33-storey mixed-use building (approved under Site Specific Zoning By-Law 1195-2022), by converting the required office use space into hotel use space (for 142 hotel suites and related facilities) on floors 1 through 10. The site is subject to a current Site Plan Control Application (File 2017 235087 STE 28 SA).
220 m away · filed Jul 8, 2024 · Approved
200 Bay St · Minor variance
To expand the existing mezzanine floor located on the 12 ½ floor level of the North Tower within the existing 26-storey commercial office building to provide additional office space.
240 m away · filed Feb 5, 2020 · Application withdrawn
55 Yonge St · Minor variance
To convert vacant office space into a medical/dental office on the ground floor of the existing twelve-storey commercial and retail building.
100 m away · filed Jul 31, 2019 · Approved
1 Adelaide St E · Minor variance
To construct two outdoor patios to be associated with restaurant uses in the east courtyard area.
240 m away · filed Dec 6, 2016 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.