Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Install a back water valve
Applied Apr 26, 2022 · issued Apr 28, 2022 · completed Jun 20, 2022 · Permit 22 138581 DRN
- Revision issued
Small residential project · Multiple projects
Revision to add 1 washroom to the ground floor and add a second washroom on the second floor. The existing washroom on the second floor decreases in size. Also adding new counters in the kitchen. Construct front 1st storey addition and construct roof above deck at rear. Refer to Committee of Adjustment Decision # A0424/09TEY.
Applied Mar 27, 2009 · issued Jan 14, 2010 · Permit 08 161570 BLD (revision 01)
- Revision issued
Plumbing
Revision to add 1 washroom to the ground floor and add a second washroom on the second floor. The existing washroom on the second floor decreases in size.
Applied Mar 27, 2009 · issued Jul 27, 2009 · Permit 08 161570 PLB (revision 01)
- Inspections under way
Plumbing
Plumbing - Proposal to construct under pinning and add basement addtion with deck overMRDD FEES OWING
Applied Jul 22, 2008 · issued Jul 22, 2008 · Permit 08 161570 PLB
- Inspections under way
Small residential project · Multiple projects
Proposal to construct under pinning and add basement addtion with deck overMRDD FEES OWING
Applied May 23, 2008 · issued Jun 9, 2008 · Permit 08 161570 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
995-1005 Broadview Avenue and 2-4 Mortimer Avenue
7 storeys · 50 homes · Mixed use
150 m away · Site plan · Approved · filed Dec 6, 2021
- Approved
954-958 Broadview Avenue and 72 Chester Hill Road
26 storeys · 309 homes · Mixed use
270 m away · Rezoning · Approved · filed Sep 3, 2025
- Under review
954-958 Broadview Avenue and 72 Chester Hill Road
26 storeys · 310 homes · Mixed use
270 m away · Site plan · Under review · filed Dec 17, 2021
- Submitted
16 storeys · 332 homes · Mixed use
350 m away · Site plan · Submitted · filed Apr 2, 2026
- Under review
6 storeys · 20 homes · Mixed use
430 m away · Site plan · Under review · filed May 5, 2023
Neighbours’ Committee of Adjustment files within 250 m
120 Fulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey dormer addition with a rooftop deck.
210 m away · filed Jul 29, 2026 · Hearing scheduled
59 Fulton Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a partial front one-storey addition (partial porch enclosure) and a new front walkway (pavers). The existing dwelling (containing two residential dwelling units) will be converted into one residential dwelling unit.
120 m away · filed Apr 8, 2026 · Approved
90 Fulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a front third storey dormer (the existing dormer will be demolished), a rear third storey addition, a rear three-storey addition with a rear basement walkout, and a rear ground floor deck with stairs.
130 m away · filed Jun 24, 2025 · Approved
80 Nealon Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition, and a rear ground floor covered deck with a rear basement extension below.
160 m away · filed Aug 1, 2024 · Approved
94 Fulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear two-storey addition, a partial third storey addition with a rear terrace (above the second storey roof), a front second storey terrace (above the front porch), and a rear ground floor deck with stairs. The existing front porch and front second storey balcony will be reconstructed.
130 m away · filed Apr 3, 2024 · Approved
55 Fulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a one-storey rear addition (with basement), a ground floor (east) side porch and stairs, as well as a rear ground floor terrace. The existing rear (ground and second floor) decks will be demolished.
120 m away · filed Aug 23, 2023 · Approved
12 Nealon Ave · Minor variance
To alter the existing one-and-one-half-storey dwelling by constructing a complete second storey addition, and to install one secondary unit within the basement. Also, to construct a rear ground floor deck with stairs. The existing ancillary building (detached garage), in the rear yard, will be maintained and unaltered.
70 m away · filed Aug 21, 2023 · Approved
26 Browning Ave · Minor variance
To construct a new two-storey ancillary building containing one laneway suite (abutting the laneway), in the rear yard of an existing two-and-one-half-storey detached dwelling. The existing one-storey detached garage will be demolished.
170 m away · filed Aug 8, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.