Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

21 Sandringham Dr

The City of Toronto has 7 building permits since 2017 (6 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • New house · New building

    Revision 01: changes made to prescribed insulation in roof cavity as per request from inspector. Construct a new detached dwelling with a rear cabana

    Applied Jan 28, 2026 · issued Feb 12, 2026 · Permit 23 158810 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    Rev 01 - Drawings and calculations revised to reflect installed sprayfoam within roof cavityHVAC - Construct a new detached dwelling with a rear cabana

    Applied Jan 28, 2026 · issued Feb 12, 2026 · Permit 23 158810 HVA (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - Construct a new detached dwelling with a rear cabana

    Applied Aug 4, 2023 · issued Aug 21, 2023 · Permit 23 158810 HVA

    Inspections under way
  • New house · New building

    Construct a new detached dwelling with a rear cabana

    Applied Jun 9, 2023 · issued Jul 13, 2023 · 1 home added · Permit 23 158810 BLD

    Inspections under way
  • Plumbing

    Plumbing - Construct a new detached dwelling with a rear cabana

    Applied Jun 9, 2023 · issued Jul 13, 2023 · Permit 23 158810 PLB

    Inspections under way
  • Drains and site services

    Drain - Construct a new detached dwelling with a rear cabana

    Applied Jun 9, 2023 · issued Jul 13, 2023 · Permit 23 158810 DRN

    Inspections under way
  • Demolition

    Demolish existing 1.5 storey dwelling

    Applied Jun 9, 2023 · issued Jul 13, 2023 · completed Jul 22, 2026 · 1 home removed · Permit 23 158837 DEM

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    Proposal to construct a new dwelling. This application was deferred on September 8th, 2022, in order to revise plans.

    Decision: Approved (hearing Mar 9, 2023)

    Filed Jun 15, 2022 · File A0423/22NY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 245 Yonge Blvd · Minor variance

    To construct a new two-storey detached dwelling.

    120 m away · filed Jan 12, 2026 · Approved

  • 248 Yonge Blvd · Minor variance

    To alter the existing two-storey detached dwelling by constructing a one-storey front addition with a new covered porch.

    160 m away · filed Nov 13, 2025 · Approved on condition

  • 241 Yonge Blvd · Minor variance

    To construct a new detached dwelling, with a balcony in the front and a rear deck.

    100 m away · filed Dec 20, 2024 · Approved

  • 273 Yonge Blvd · Minor variance

    Proposed addition of rear extension, rear covered deck, carport and covered entranceway.

    240 m away · filed Mar 27, 2024 · Approved

  • 267 Yonge Blvd · Minor variance

    Proposal to construct a new single family dwelling

    210 m away · filed Sep 27, 2023 · Approved

  • 266 Yonge Blvd · Minor variance

    Proposal to construct a new dwelling.

    220 m away · filed Dec 28, 2021 · Approved

  • 273 Yonge Blvd · Minor variance

    To construct a sunaroom addition at the rear, and a front yard porch and canopy.

    240 m away · filed Nov 5, 2020 · Approved

  • 269 Yonge Blvd · Minor variance

    To construct a new dwelling.

    220 m away · filed Jun 5, 2020 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.