Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 21, Scarborough Centre

210 Bellamy Rd N

The City of Toronto has 5 building permits since 2017 (5 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · New laneway / rear yard suite

    REV01: Proposed revision for Foundation Revised to Steel PilesNew Rear Yard Garden Suite Accessory to SFD

    Applied Aug 26, 2024 · issued Sep 9, 2024 · Permit 24 146680 BLD (revision 01)

    Revision issued
  • Small residential project · New laneway / rear yard suite

    New Rear Yard Garden Suite Accessory to SFD

    Applied May 10, 2024 · issued Jun 14, 2024 · 1 home added · Permit 24 146680 BLD

    Permit issued
  • Heating and ventilation

    HVAC - New Rear Yard Garden Suite Accessory to SFD

    Applied May 10, 2024 · issued Jun 14, 2024 · Permit 24 146680 HVA

    Permit issued
  • Drains and site services

    Drain - New Rear Yard Garden Suite Accessory to SFD

    Applied May 10, 2024 · issued Jun 14, 2024 · Permit 24 146680 DRN

    Inspections under way
  • Plumbing

    Plumbing - New Rear Yard Garden Suite Accessory to SFD

    Applied May 10, 2024 · issued Jun 14, 2024 · Permit 24 146680 PLB

    Permit issued

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 235 Bellamy Rd N · Minor variance

    To construct a rear one storey sunroom to existing dwelling.

    130 m away · filed Nov 20, 2023 · Approved

  • 7 Braeburn Blvd · Minor variance

    To construct a new two-storey detached dwelling with integral two car garage.

    210 m away · filed Jul 23, 2021 · Approved

  • 49 Cedar Brae Blvd · Minor variance

    To construct a new two-storey detached dwelling with integral two car garage.

    220 m away · filed May 5, 2021 · Approved

  • 3 Braeburn Blvd · Consent

    Proposal to sever the existing lot into 2 parcels.

    250 m away · filed May 5, 2021 · Application withdrawn

  • 191 Bellamy Rd N · Minor variance

    The applicant is seeking relief from the provisions of the Zoning By-law to construct a new two storey single family residential dwelling.

    230 m away · filed Jan 29, 2018 · Refused

  • 191 Bellamy Rd N · Minor variance

    The applicant is seeking relief from the provisions of the Zoning By-law to construct a new two storey single family residential dwelling.

    230 m away · filed Jan 29, 2018 · Refused

  • 191 Bellamy Rd N · Consent

    This application is for consent to sever the land into two lots, as shown on the attached Site Plan. Lots to be created Part 1 and Part 2 would have a frontage of 9.52 metres and a lot area of 476.8 square metres. In order to facilitate the proposed development, relief from the provision of the Zoning By-law was requested, as outlined in A0038/18SC and A0039/18SC.

    230 m away · filed Jan 29, 2018 · Refused

  • 232 Bellamy Rd N · Minor variance

    The owner is requesting consent to sever the land at 232 Bellamy Road N. into two lots, and has applied for variances for the proposed lot shown as Part 1 on the attached Lot Division Plan. The owner is proposing to demolish the existing dwelling and build a new single family dwelling.

    240 m away · filed Jun 20, 2016 · Refused

Everything planned in Scarborough Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.