Toronto address · Ward 14, Toronto-Danforth
211 Woodycrest Ave
The City of Toronto has 5 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - To demolish the existing house and build a new two storey stone&stucco house with integral garage, front porch,rear deck and basement walk-out.
Applied Oct 19, 2022 · issued Nov 4, 2022 · completed Oct 1, 2024 · Permit 22 219108 HVA
- Closed
Plumbing
Plumbing - To demolish the existing house and build a new two storey stone&stucco house with integral garage, front porch,rear deck and basement walk-out.
Applied Oct 19, 2022 · issued Nov 4, 2022 · completed Oct 1, 2024 · Permit 22 219108 PLB
- Closed
New house · New building
To demolish the existing house and build a new two storey stone&stucco house with integral garage, front porch,rear deck and basement walk-out.
Applied Oct 19, 2022 · issued Nov 4, 2022 · completed Apr 9, 2025 · 1 home added · Permit 22 219108 BLD
- Closed
Demolition
To demolish the existing house and build a new two storey stone&stucco house with integral garage, front porch,rear deck and basement walk-out.
Applied Oct 19, 2022 · issued Nov 4, 2022 · completed Jan 30, 2023 · 1 home removed · Permit 22 219125 DEM
- Closed
Drains and site services
Drain - To demolish the existing house and build a new two storey stone&stucco house with integral garage, front porch,rear deck and basement walk-out.
Applied Oct 19, 2022 · issued Nov 4, 2022 · completed Oct 1, 2024 · Permit 22 219108 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
245 Gowan Ave · Minor variance
130 m away · filed Jan 12, 2026 · Application withdrawn
233 Gowan Ave · Minor variance
To alter the existing two-storey detached dwelling (duplex) by constructing a rear third storey addition. There will be a total of two residential dwelling units on this lot (one unit occupying the ground level, and one unit occupying the second and third levels).
130 m away · filed Sep 8, 2025 · Approved
193 Mortimer Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by enclosing the existing front porch into habitable space.
180 m away · filed Feb 19, 2025 · Approved
270 Floyd Ave · Consent
To obtain consent to sever the merged property into three residential lots.
180 m away · filed Dec 10, 2024 · Approved
169 Woodycrest Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a new front porch, which will be enclosed and to reconstruct the front stairs.
180 m away · filed Sep 7, 2023 · Approved
185 Gowan Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a detached ancillary building (gazebo) in the rear yard.
250 m away · filed Oct 11, 2022 · Approved
256 Gowan Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a front integral garage, a two-storey rear addition (with a ground level deck and basement walkout), as well as a second storey addition.
220 m away · filed Jun 27, 2022 · Approved
252 Westwood Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear basement addition with a ground floor deck above.
50 m away · filed Mar 15, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.