Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

212 Dundas St E

The City of Toronto has 1 building permit since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Demolition

    Proposal to demolish the existing 4 storey commercial building with the retention of the exterior street facing facade of the Filmore Hotel building.See 20 151363 STE 13 SA for future proposal.

    Applied Jun 22, 2023 · issued Jul 6, 2026 · Permit 23 164776 DEM

    Permit issued

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.

    Decision: Approved (hearing Jul 15, 2026)

    Filed Apr 30, 2026 · File A0335/26TEY

    Closed

What’s planned nearby

Development sites within 500 m

  • 212-218 Dundas Street East and 279 1/2 George Street

    44 storeys · 542 homes · Mixed use

    30 m away · Condominium · Under review · filed Oct 25, 2021

    Under review
  • 239-255 Dundas Street East

    52 storeys · 630 homes · Mixed use

    50 m away · Site plan · Under review · filed Mar 18, 2022

    Under review
  • 295 Jarvis Street

    60 storeys · 618 homes · Residential

    180 m away · Site plan · Under review · filed Nov 15, 2022

    Under review
  • 214-230 Sherbourne Street

    47 storeys · 619 homes · Residential

    180 m away · Site plan · Under review · filed Sep 16, 2022

    Under review
  • 207-219 Jarvis Street

    32 storeys · 315 homes · Mixed use

    220 m away · Rezoning · Under review · filed Mar 31, 2026

    Under review
  • 309-349 George Street

    10 storeys · Not stated in the file

    240 m away · Rezoning · Under review · filed Oct 15, 2025

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 291 Jarvis St · Consent

    To obtain consent for the purpose of a stratified lot addition (air-rights) above an elevation of 119 m of the property municipally known as 285-291 Jarvis Street.

    160 m away · filed Apr 2, 2026 · Approved

  • 225 Jarvis St · Minor variance

    To alter the development standards of the 49-storey mixed-use building (as approved under Site Specific Zoning By-laws 764-2020(OMB) and 765-2020(OMB)) by increasing the total/residential gross floor area (from the first storey to the 20th storey). Also, to reduce the number of required parking spaces on-site. The total number of hotel suites (215 suites) and residential dwelling units (580 units) will be maintained.

    150 m away · filed Mar 4, 2025 · Approved

  • 291 George St · Minor variance

    To alter the existing five-storey apartment building by converting one parking space (located on the B1 parking level) into a storage area use. There will be a total of 47 parking spaces on-site instead of 48 parking spaces.

    80 m away · filed Jan 29, 2025 · Approved

  • 75 Mutual St · Minor variance

    To alter the existing three-storey detached building by constructing a fourth storey addition, and a rear four-storey addition. This building will contain a total of 18 dwelling rooms (multi-tenant house).

    230 m away · filed Dec 9, 2024 · Approved

  • 203 Jarvis St · Consent

    To obtain consent to a strata severance and to create various easements/rights-of-way.

    220 m away · filed Sep 17, 2024 · Approved

  • 225 Jarvis St · Minor variance

    To permit access to the loading area of the 49-storey mixed-use building (as approved under Site Specific Zoning By-laws 764-2020(OMB) and 765-2020(OMB)) from the abutting street on the east side of the building (George Street). This mixed-use building will contain 215 hotel suites, one ground floor restaurant use, and 580 residential dwelling units.

    150 m away · filed Jun 22, 2024 · Approved

  • 203 Jarvis St · Minor variance

    To alter the development standards for the 32-storey mixed-use building (as approved under Site Specific Zoning By-law 683-2020(LPAT)) by reducing the width of the bicycle parking spaces.

    220 m away · filed Oct 23, 2023 · Approved

  • 202 Jarvis St · Minor variance

    To construct a new 14-storey building (the 15th storey will be used for mechanical equipment) with a front third storey roof terrace, east and west side roof terraces on the third, fifth and seventh storey, a rear seventh storey roof terrace, and a complete roof terrace on the roof level. The mixed-use building will contain classroom spaces, faculty offices, and common areas for academic purposes.

    130 m away · filed May 23, 2023 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.